13-3
1
Scope
This document describes the Calibration procedures and also serves as a Sea Acceptance Test (SAT)
for JLN-900 Speed Log. The SAT for JLN-900 Speed Log is used to verify that the system works, and
to calibrate the log. The document contains a list of equipment needed, how to perform the test and a
test protocol.
To aid future customer support, it is necessary that two sets of the protocol pages are filled-in. One set
should be returned to JRC and the other set should be left in the reference manual on board the ship.
2
Equipment needed
In addition to the log system, the following equipment is needed:
x
The log system must have a Speed Log Master Display such as an NWW-82 Main Display
with two-way communication to access the different menu systems.
x
Display unit for speed and distance indication (such as NWW-82 Main Display). The Speed
Log Master Display can be used.
x
This SAT instruction.
x
For the STW log calibration a test site is needed, where accurate distance and speed trials can
be made.
x
A reference positioning system if the speed over the ground log is to be calibrated. Note!
Calibration of the SOG log is hard to perform and is normally not done on merchant ships. If
DGPS is used as positioning system, always compare it with BTR distance, bottom track
resulting distance, and the SOG log must be within depth range and indicate speed for the total
distance accumulation.
3
Test procedure for bottom track (ground speed)
Ensure that the bottom track log locks on bottom within measurement range and indicate speed.
3.1 SOG Transducer angle calibration
If the SOG shows a transversal speed bias (= the transversal distance trip counter accumulates false
distance) when no drift is present, the transducer alignment may be adjusted. There are two ways to
compensate for the transducer angle.
We strongly recommend the method in which the transducer is mechanically accurately aligned by
test runs.
If this is not possible, there is also an alternative way to compensate the angle in software by adjusting
the calibration angle.
To align the transducer represents an even harder problem in finding accurate enough reference
systems. In some installations, where two axis speed is fed to an integrated navigation system together
Summary of Contents for JLN-900
Page 2: ......
Page 12: ...x This page is intentionally blank ...
Page 17: ...2 1 JLN 900 Technical Description ...
Page 23: ...2 7 sigbel ...
Page 30: ...2 14 This page is intentionally blank ...
Page 31: ...3 1 JLN 900 Technical Specification ...
Page 38: ...3 8 This page is intentionally blank ...
Page 39: ...4 1 JLN 900 Installation of Transducer and Bottom Parts ...
Page 59: ...4 21 Transducer and Valve Cover mounted Sea Valve fully opened ...
Page 63: ...4 25 Fig 1 3 Aligning Transducer Connecting Tube ...
Page 76: ...4 38 Mounting Sea Valve on Upper Flange DB ...
Page 81: ...4 43 Gasket Seal 2 ...
Page 83: ...4 45 Transducer and Valve Cover mounted Sea Valve fully opened ...
Page 86: ...4 48 Tube Bracket in its final position with Transducer flush seated ...
Page 88: ...4 50 Fig 2 5 Aligning Transducer Connecting Tube ...
Page 92: ...4 54 This page is intentionally blank ...
Page 93: ...5 1 JLN 900 Installation of NJC 80 Sig Processor ...
Page 150: ...6 50 This page is intentionally blank ...
Page 151: ...7 1 JLN 900 Display Technical Description ...
Page 167: ...7 17 No Name Default setting Function SD 4 2 SD 4 3 SD 4 4 there are remote systems connected ...
Page 179: ...8 1 JLN 900 Analog Display Technical Manual ...
Page 183: ...8 5 2 1 Main Dimensions NWW 828 Analog Display ...
Page 184: ...8 6 2 2 Dimmer Potentiometer connection Analog Display ...
Page 186: ...8 8 This page is intentionally blank ...
Page 187: ...9 1 JLN 900 Menu System ...
Page 208: ...9 22 This page is intentionally blank ...
Page 209: ...10 1 JLN 900 WATER TRACK Technical Manual including Menu system ...
Page 233: ...11 1 JLN 900 IEC 61162 NMEA 0183 User Guide ...
Page 254: ...11 22 This page is intentionally blank ...
Page 255: ...12 1 JLN 900 Harbour Acceptance Test ...
Page 266: ...12 12 This page is intentionally blank ...
Page 267: ...13 1 JLN 900 Calibration and Sea Acceptance Test ...
Page 280: ...13 14 This page is intentionally blank ...
Page 281: ...JLN 900 system drawings 14 1 ...
Page 289: ...CFT 780 4 TRANSDUCER 40m 14 9 ...
Page 290: ...NKF 980 Sea Valve 14 10 ...
Page 291: ...NKF 980 Sea Valve 14 11 ...
Page 292: ...NWW 82 MAIN DISPLAY 14 12 ...
Page 293: ...DISPLAY 3 1 87 14 13 ...
Page 294: ...NCM 1080 DIMMER UNIT 14 14 ...
Page 295: ...15 1 JLN 900 Description labels and drawings ...
Page 300: ...15 6 This page is intentionally blank ...
Page 301: ...16 1 Annex JLN 900 Speed Log System Manual ...
Page 302: ...16 2 Annex Table of contents ANNEX I EQUIPMENT RECYCLING 3 ANNEX II ENERGY SAVING 5 ...
Page 306: ...16 6 This page is intentionally blank ...
Page 307: ......