background image

MANUAL DE INSTRUCCIONES  

 

 

CODE 80328 REV A 

 

 

12/2021          Pag.: 25

J

.P.  SELECTA s.a.u. 

 

Autovía A-2 Km 585.1 Abrera  08630  (Barcelona) España 

Tel 34 937 700 877   Fax 34 937 702 362

 e-mail: [email protected] - website:  http://www.grupo-selecta.com

To put or remove the cover, hold it as seen on the picture and turn the 

central nut clockwise to place it or anti clockwise to remove it.

For an easy windbreak cover extraction, hold it like in the picture and 

pull up.

6.5 Power supply connection

Installation of the mains must be performed by qualified personnel.

Connect the equipment to the main power, checking that the power 

voltage is as indicated on the machine’s specification plate.

Install an emergency disconnect switch (20Amp) to cut power supply 

in case of malfunction. 

This switch must be installed at a minimum distance of 10m from the 

centrifuge (preferably outside the room where the centrifuge is).

Sections and colours of the connection cable:

Brown cable 6mm: 

 

Phase

Black cable 6mm: 

 

Phase

Blue cable 6mm: 

 

Neutral

Yellow/green cable 6mm: 

Earth

Do not use the equipment if it is not connected to earth.

Summary of Contents for 7001490

Page 1: ...J P SELECTA s a u Autov a A 2 Km 585 1 Abrera 08630 Barcelona Espa a Tel 34 937 700 877 Fax 34 937 702 362 e mail selecta jpselecta es website http www grupo selecta com Macrofriger BLT Blood 7001490...

Page 2: ...com Indice 1 Seguridad 3 2 Informaci n general 4 3 Lista de embalaje 5 4 Accesorios 5 5 Especificaci n t cnica 6 6 Instalaci n 7 7 Operaci n 11 8 Men s de funcionamiento 12 9 Mantenimiento 16 Aviso a...

Page 3: ...uestras Riesgo de piezas expulsadas Riesgo el ctrico 1 2 Cualificaci n del personal Este equipo s lo puede ser utilizado por personal cualificado adecua damente en la utilizaci n de equipos de laborat...

Page 4: ...800 ml Tapa con doble cierre de seguridad Circuito electr nico digital gobernado por micro proce sador para el control de todos los par metros de funciona miento Velocidad Aceleraci n Freno RCF Temper...

Page 5: ...ml 1 frasco de 1000 ml o 1 bolsa 98 x 175 300 4070 29 5370 7001395 3000 ml 1 frasco de 500 ml 70 x 165 300 4070 29 5370 7001396 1200 ml 1 frasco de 200 ml 56 6 x 104 300 4070 29 5370 7001397 1200 ml 2...

Page 6: ...Resoluci n 4 g Temperatura 0 35 C Estabilidad 2 C Resoluci n 1 C Rango de Tiempo 99h 59 min Radio de Centrifugaci n 290 mm Rampas de Aceleraci n n 1 2 3 4 5 rpm minuto 4 6 12 17 24 Rampas de Frenado 0...

Page 7: ...LVENTES U OTROS PRODUCTOS SUSCEPTIBLES DE FORMAR MEZCLAS EXPLOSIVAS O INFLAMABLES 6 Instalaci n 6 1 Transporte La centr fuga se suministra con cuatro bridas laterales a fin de facilitar su embragado R...

Page 8: ...unto inicial Una vez instalada la m quina sacar las bridas laterales y colocar los tapones que se suministran a tal efecto Mediante los 4 topes de goma ajustar de forma que quede la m quina levantada...

Page 9: ...alineadas las chabetas y sus alojamientos y que el cabezal entre perpendicular en el eje El cabezal tiene que entrar de forma suave no es necesario el uso de mazas ni martillos Colocar y apretar la tu...

Page 10: ...i n a la red el ctrica debe ser realizada por personal cualificado Conectar el equipo a la red asegur ndose previamente que la tensi n del suministro coincide con la indicada en la placa de caracter s...

Page 11: ...e densidades superiores a 1 2gr cm3 la veloci dad m xima del cabezal se debe disminuir seg n la siguiente f rmula Rpm Rpm m x x 1 densidad donde Rpm velocidad m x de fluidos superiores a 1 2gr cm3 Rpm...

Page 12: ...arga de datos actualizaciones del sofware inicializar contadores de vida til PROGRAMACI N Para establecer los programas para el tratamiento de la muestras Tiempos Velocidad Temperatura TRABAJO Para se...

Page 13: ...aproximados de aceleraci n SLOPE 0 4 rpm x segundo SLOPE 1 6 rpm x segundo SLOPE 2 12 rpm x segundo SLOPE 3 17 rpm x segundo SLOPE 4 24 rpm x segundo Velocidad rpm y tiempo minutos segundos y una lti...

Page 14: ...do 7 Inicialmente se le pedir el accesorio que se utiliza en el pro grama para la contabilidad de su vida til VASO NORMAL 7001393 VASO DOBLE 7001392 Pulsar sobre RUN para inciar el programa El program...

Page 15: ...r p m RCF 2633 g Aceleraci n 3 Frenada 10 Tiempo 4 minutos 30 seg Temperatura 22 C Programa 3 CONCENTRADO de PLAQUETAS a partir del BUFFY COAT Velocidad 3660 r p m RCF 4583 g Aceleraci n 3 Frenada 10...

Page 16: ...len suministrada aflojar los tornillos ver foto 3 Con la llave fija suministrada verificar el apriete de la tuerca ejerciendo presi n seg n el sentido de las agujas del reloj ver foto 4 Vigilar peri d...

Page 17: ...en su inspecci n periodica trimestral Puerta bisagras cierre y chasis visualmente inspeccionar la aparici n de grietas deformaciones manchas de xido etc que puedan indicar la disminuci n de la resiste...

Page 18: ...tric risk 1 2 Personnel qualification This equipment can only be used by personnel who have been properly qualified This equipment can only be used by personnel who have read and understood these inst...

Page 19: ...gs EN ISO 3826 1 of 500 or 800 ml Lid with double safety lock Digital electronic circuit controlled by microprocessor for controlling all operating parameters Speed Acceleration Brake RCF Temperature...

Page 20: ...8 1200 ml 4 tubes 50 ml 34 x 100 300 4070 29 5370 7001399 1350 ml 9 tubes 25 ml 24 x 100 300 4070 29 5370 7001400 1530 ml 17 tubes 15 ml 16 5 x 100 300 4070 29 5370 7001401 1008 ml 24 tubes 7 ml 12 x...

Page 21: ...tability 5 g Resolution 4 g Temperature range 0 35 C Stability 2 C Resolution 1 C Time range 99h 59 min Centrifugation radius 290 mm Acceleration ramps n 1 2 3 4 5 rpm minute 4 6 12 17 24 Braking ramp...

Page 22: ...E USED OR STORED 6 Installation 6 1 Transport The centrifuge comes with four lifting supports for positioning the unit Note that the unit weights 429 Kg 6 2 Location Place the centrifuge on an horizon...

Page 23: ...etup Once the unit is installed remove the lifting supports and put the hole taps supplied into place Adjust the 4 levelling rubber feet supports so that the unit is raised and do not rest on the whee...

Page 24: ...ings are perfectly aligned and that it fits perpendicular to the axis The rotor should slide easily it is not necessary to use a mallet or hammer Place and screw the locking nut in place and tighten u...

Page 25: ...p 6 5 Power supply connection Installation of the mains must be performed by qualified personnel Connect the equipment to the main power checking that the power voltage is as indicated on the machine...

Page 26: ...th a higher density than 1 2gr cm3 the rotor s maximum speed must be reduced according to the following formula Rpm Max Rpm x 1 density where Rpm Max speed of fluids higher than 1 2gr cm3 Max Rpm Maxi...

Page 27: ...essing on the touch screen SETTINGS To update date time language data download software updates life counters initialization PROGRAMMING To establish programs for samples treatment Times Speed Tempera...

Page 28: ...ope Approximate acceleration values SLOPE 0 4 rpm x seconds SLOPE 1 6 rpm x seconds SLOPE 2 12 rpm x seconds SLOPE 3 17 rpm x seconds SLOPE 4 24 rpm x seconds Speed rpm and time minutes seconds and A...

Page 29: ...running First of all we are asked about the accessory used in the pro gram for its service life accounting SINGLE BUCKET 7001393 DOUBLE BUCKET 7001392 Press on RUN to start the program The program st...

Page 30: ...OAT Speed 2850 r p m RCF 2633 g Acceleration 3 Braking 10 Time 4 minutes 30 seconds Temperature 22 C Program 3 PLATELET CONCENTRATE FROM BUFFY COAT Speed 3660 r p m RCF 4583 g Acceleration 3 Braking 1...

Page 31: ...Using the Allen key supplied loosen the screws see picture 3 Using the spanner provided check the tightening of the nut by pressing in the clockwise direction see picture 4 Periodically check the rot...

Page 32: ...iodical inspection quarterly Door hinges closing and chassis visually examine the ap pearance of cracks deformations rust spots etc that may indicate decreased resistance of the material Rubber feet v...

Reviews: