Jøtul NVI 2000 Installation Manual Download Page 15

15

Jøtul Chimney system

Through-connection, flammable wall 

In the case of a through-connection in a wall where 
the insulation material comprises chipboard, loose 
wool or equivalent, a shaft must be built with meas-
urements in accordance with the table on page 5.

The shaft must be insulated with the enclosed rock 
wool mat.

min. 50 mm

min. 50 mm

Dekkeplate

Diffusjons-
sperre 
monteres 
mot vind-
sperre

Diffusjonssperre 
monteres mot 
fuktsperre på 
innsiden

Dekkeplate

Standard installation through outer wall

Floor structure with blown insulation

When blown insulation is used in the floor structure, 
a plate shaft, spiral pipe or similar round pipe mod-
ule must be installed with a minimum distance of 5 
cm.

Non-flammable material

In the case of a through-connection in non-flam-
mable material of class EI60, no safety distance is 
required. Some distance is required for clearance and 
space for a length extension.

NVI 2000 - THROUGH-CONNECTIONS

Walls and roofs in houses

When making a hole in a house, it is extremely important for the installation to be completely airtight, as 
otherwise there is a risk of condensation forming in the roof structure; the use of a diffusion barrier is therefore 
necessary.

The diffusion barrier must seal around the entire chimney; slits must not be cut in the hole in the membrane.

The diffusion barrier must also seal against the plastic film around the entire installation. Glue the diffusion 
barrier to the plastic film. If the diffusion barrier’s outer dimensions need to be cut to a smaller size, more tape 
must be used to ensure the seal. Use the tape recommended by the company that produces the plastic film. For 
example, diffusion barrier tape or butyl tape. 

Cover plate

Cover plate

min. 50 mm

min. 50 mm

Diffusion 
barrier 
installed 
against wind 
barrier

Diffusion barrier 
installed against 
moisture barrier 
on the inside

Summary of Contents for NVI 2000

Page 1: ...23 06 2017 JAN 2019 INSTALLATION GUIDE NVI 2000 Chimneysystem MARKEDETS SIKRESTE ST LPIPE THE SAFEST CHIMNEY ON THE MARKET...

Page 2: ......

Page 3: ...ur interior design The choice of NVI ensures a safe and secure product for you and your family FOREWORD Contents Connection duct Combi 31 Getting started 7 Extra cladding pipe Combi 34 Warranty provis...

Page 4: ...eed for the building application can be found in the pipe s performance declaration in this installation guide and which can also be downloaded from our website www jotul no Fire protection and safety...

Page 5: ...ney Using NVI s chimney system it is possible to connect multiple fireplaces to the same pipe Certain normative regulations and requirements informative guidelines and calculation methods are set out...

Page 6: ...GHT ABOVE ROOF If the distance from the roof ridge is 2 3 meter an installation height of 0 4 metres above the roof ridge is recommended SAFETY RESISTANCE TO THE NEAREST FLAMMABLE MATERIALS VERTICAL M...

Page 7: ...our new fireplace has been used a few times Climbing arrangements If pipe s outlet is higher than 1 2 m at the point where you climb up a work platform or a module must be installed with a sweeping ha...

Page 8: ...cleaned with most detergents that are suitable for painted surfaces NB Distinguish between detergents and solvents Thinning solvents can damage the powder painted outer casing Grease spots which can a...

Page 9: ...r chimneys Connected at top Semi insulated Connected at top Uninsulated Connected at rear through inner wall Connected at rear Semi insulated Connected at top Fully insulated Connected at rear Uninsul...

Page 10: ...ce Rain collar Roof seal Stay plate Diffusion barrier Ceiling ring Rear connection Support leg Wall bracket Angled connection Module Fully insulated Module Semi insulated Bottom fitting Diffusion barr...

Page 11: ...bottom by the fireplace NB Ensure that the tongue groove system is pressed firmly together also applies to the cladding pipe evt adapter Innertakplate Kulefanger ved behov 300 mm 300 mm evt adapter In...

Page 12: ...e nut on the foot The length of the cladding pipe must be adapted to the existing installation Start by removing the ring from the bottom of the rear connection Place the cladding pipe to the side of...

Page 13: ...the ceiling plate The hole must be the same size as the cladding pipe Cut the panel in half and insert the pieces up into the floor structure around the chimney ROUND COVER PLATE in degree interval 2...

Page 14: ...insulation sup plied with ceiling ring is then used next to the ceiling Where the floor structure s insulation is up to 400 mm thick not loose wool rock wool insulation made of a mesh reinforced mat...

Page 15: ...required Some distance is required for clearance and space for a length extension NVI 2000 THROUGH CONNECTIONS Walls and roofs in houses When making a hole in a house it is extremely important for the...

Page 16: ...e safe ty distance of 50 mm is satisfied throughout the installation NB Do not place the adapter in the wall through connection DIAMETER FLUE PIPE A MM 125 258 150 258 190 258 250 318 50 mm B min 50 m...

Page 17: ...ece if one is used NB When installing a wall bracket with an extension piece start by assembling the wall bracket and extension piece with screws and nuts in the fixed holes Note that both parts must...

Page 18: ...screws Solder the pipe Secure the bottom fitting to the ceiling then tighten the screws for the stay ring in the bottom fitting Note the distance of 50 mm from cladding to flamma ble material Bottom f...

Page 19: ...the entire row of tiles Pay attention to runoff Ensure that the rubber membrane is shaped so that there can be no stand ing water Take particular care at the transition between roofing tiles and the l...

Page 20: ...centre over the bottom fitting and screw into place Make sure that the roofing is clean Roll out the alu minium membrane and remove the protective tape then shape the membrane so that it seals tightl...

Page 21: ...them at the joints with screws on all sides Pre drill using a 3 mm drill bit Minimum 10 cm overlap at the joints A A 450 mm mm 410 mm Installation of telescopic section and rain protection The telesco...

Page 22: ...he roof structure Secure it to the roof Then build a frame around the bottom fitting s con necting piece at the same height as the roofing Return the cornice and then the roofing Thread the roof seal...

Page 23: ...he roofing In some cases it may be necessary to cut roofing tiles Then place the roof seal in position centre over the roof plate and screw into place Make sure that the roofing is clean Roll out the...

Page 24: ...roof seal or extension plate NVI 2000 ROOF HOOD Installation advice Alumembrane Installation advice alumembrane It is important to seal the transition between the roofing and pipe wall boxes skylight...

Page 25: ...r joint on the rain collar This must be done before the attach ment bolt has been completely tightened to ensure that the rain collar is not pulled crooked leading to leaks Finally tighten the attachm...

Page 26: ...flue pipes can be cut with an an gle grinder jigsaw or hack saw Cut the cladding pipe with care as this part is visible The insulation can be cut with an insulation saw or knife Cut the insulation on...

Page 27: ...correct position Continue to install the correct chimney sections bearing in mind the location of any cleaning hatches so that they are easily accessible NB In the case of external installation a spe...

Page 28: ...28 www jotul no NVI 2000 COMBI...

Page 29: ...ised definitions NVI 200COMBI SS EN 1856 1 2009 T450 N1 D W V2 L50100 G50 The NVI 2000 Combi is not intended for the use of several fireplaces in the same pipe Otherwise the same advice and provisions...

Page 30: ...ct 60 mm insulation Rain top Rain protector piece Rain collar Roof seal Stay plate Ceiling ring Connecting piece Connecting duct Module Fully and semi insulated Standard and Combi Bottom fitting Diffu...

Page 31: ...odule so that the insulation is secured during installation Installation of NVI2000 COMBI Connecting duct Read through the fireplace producer s guidelines regarding supply air Depending on the firepla...

Page 32: ...e safety distance of 50 mm to flammable mate rials must always be observed Use the insulation that is supplied with the ceiling plate as this acts as protection against draughts When making holes the...

Page 33: ...uppermost cladding pipe Roof hood square When adapting the chimney length it is important to ensure that the supply air is able to pass freely through the top of the chimney Leave a distance of at lea...

Page 34: ...ngth so that the rubber ring is cut off Install the enclosed distance strips inside the pipe three strips with equal spacing at the bottom and the same at the upper edge Then install the extra claddin...

Page 35: ...ccordance with the produces recommendations and the fireplace must be used with fuel that is approved for the chimney In addition the chimney must not be exposed to flue gas temperatures in excess of...

Page 36: ...ble materials been checked COMMENTS Has the height above the roof been checked COMMENTS Has the potential to sweep the chimney been checked COMMENTS Is there safe access for a chimney sweep on the roo...

Page 37: ...of such a confirmation is also essential for J tul s warranty for the product Ensure that this page is filled out and that a copy is sent to the local authority s chimney sweep service Look after the...

Page 38: ...B C 235 565 330 410 740 580 620 950 880 800 1130 1130 1050 1380 1480 1220 1550 1730 1440 1770 2030 1610 1940 2280 1860 2190 2630 2670 3000 3780 3490 3820 4930 4300 4630 6080 5110 5440 7230 Angle 52 f...

Page 39: ...250 1770 2320 2500 2015 2565 2850 2830 3380 4000 3640 4190 5150 4455 5005 6300 5270 5820 7450 Angle 52 for roof pitch 38 A B C 435 890 550 630 1040 800 870 1230 1100 1065 1380 1350 1340 1600 1700 1540...

Page 40: ...fasthet 0 6kN Icke vertikal installation Maximalt 1 5 m mellan f stpunkter 15 90 H llfasthet f r vindlast Maximalt 1 8 m frist ende ver tak utan stag Resistens mot vatten och ngdiffusion Uppfyller Res...

Page 41: ...r Dragh llfasthet 0 6kN Icke vertikal installation Maximalt 1 5 m mellan f stpunkter 15 45 H llfasthet f r vindlast Maximalt 1 8 m frist ende ver tak utan stag Resistens mot vatten och ngdiffusion Upp...

Page 42: ...A H llfasthet f r vindlast Maximalt 1 8 m frist ende ver tak utan stag Resistens mot vatten och ngdiffusion Uppfyller Resistens mot kondensat Uppfyller Resistens mot korrosion Uppfyller V2 Resistens f...

Page 43: ......

Page 44: ...TAD E mail st lpipe jotul no www jotul no Follow us on Facebook www facebook com jotulint J tul continuously strives to improve its products and reserves the right to modify specifications colours and...

Reviews: