1.

The insert must be connected to a code-approved
masonry chimney with a direct (positive) flue
connector into the first chimney liner section.

2.

The cross-sectional area of the chimney flue may
not be less than the cross-sectional area of the
flue collar..

3.

A sealed block-off plate must be installed at the
damper area of the existing fireplace

, unless the

liner is connected to the top of the chimney. See
fig. 8.

4.

For internal chimneys,

 (no sides of the chimney

exposed to the outside below the roofline,) a
positive connection into the first flue tile is accept-
able provided the tile is no larger than 8” x 12”.

5.

For external chimneys, 

(one or more sides are

exposed to the outside below the roof line,
including garages), a positive connection to the
first flue tile is acceptable provided the tile is no
larger than 8” x 8”.

6.

A 6”, 7”,  or 8” stainless steel liner, extending the
full height of the chimney, is required 

for those

installations where the flue tile is greater than
8” x 12” for internal chimneys, or
8” x 8” for external chimneys.
    In this case, a damper block-off plate is not
required.

C

C

C

C

Canada R

anada R

anada R

anada R

anada Requir

equir

equir

equir

equiremen

emen

emen

emen

ement:

t:

t:

t:

t:

The insert must be installed with a continuous
chimney liner of 6” (152 mm) diameter extending
from the fireplace insert to the top of the chimney.
The chimney liner must conform to the Class 3
requirements of CAN/ULC-S635, Standard for Lining
Systems for Existing Masonry or Factory-Built
Chimneys and Vents, or CAN/ULC-S640, Standard for
Lining Systems for New Masonry Chimneys.
See fig. 9.

Do not use aluminum or galvanized steel pipe for
chimney connection components - these materials
are not suitable for use with solid fuel.

Locking

Bracket

Damper

Frame

Adjustable

Sealing Plate

Flex

Connector

Apply sealant

around damper

opening

Flex Connector

Pipe extends

into the first flue

tile

Figure 8.  Positive Chimney Connection with an
example of a damper block-off plate - U.S. only.

Attach

Fireplace

Conversion

Notice Plate to

Rear Wall of

Fireplace

Summary of Contents for C 550 Rockland

Page 1: ...l C 550 Rockland J tul C 550 Rockland Fireplace Insert Keep these instructions for future reference Installation and Operating Instructions for the United States Canada J tul C 550 Rockland Fireplace...

Page 2: ...nd NOTICE YOU SHOULD CONSULT THE AUTHORITY HAVING JURISDICTION IN YOUR LOCALE SUCH AS MUNICIPAL BUILDING DEPARTMENT FIRE DEPARTMENT FIRE PREVENTIOIN BUREAU ETC BEFORE INSTALLATION TO DETERMINE THE NEE...

Page 3: ...te 15 Blower 16 Maintenance Ash Removal 17 Glass Care 17 General Maintenance 18 Gaskets 18 Illustrated Parts Breakdown Parts List 20 21 Miscellaneous Replacement Parts 22 Appendix A Baffle Assembly 23...

Page 4: ...pectant les directives d installation suivantes Consultez les autorit s locales du b timent ou de la pr vention des incendies au sujet des restrictions et exigences relatives aux inspections d install...

Page 5: ...chimney performance Consult your local J tul autho rized dealer regarding specific installation performanceissues Installation Preparation We strongly urge you to have your authorized J tul dealer ins...

Page 6: ...nsert meets U S EPA emission limits for wood heaters sold after July 1990 and is tested and listed to ANSI UL 1482 and CAN ULC S628 93 It is intended for installation in accordance with NFPA 211 or CA...

Page 7: ...equire insulation in order to achieve a UL 1777 or ULC S635 listing Check with the liner manufacturer to determine if insulation is required Insulation is recommended especially if the chimney is loca...

Page 8: ...s of the centerline of the insert See fig 6 A The convection chamber louvers of the zero clearance fireplace MUST NOT be blocked off The use of the cast iron surround panels may not be possible in the...

Page 9: ...gure 7 Mantel Clearance Detail measured from the hearth surface to the lowest mantel surface Clearance to Combustible Materials There may be no combustible materials located anywhere within 36 914 mm...

Page 10: ...or 8 stainless steel liner extending the full height of the chimney is required for those installations where the flue tile is greater than 8 x 12 for internal chimneys or 8 x 8 for external chimneys...

Page 11: ...ce Plate PN 220508 to the back wall of the masonry fireplace firebox where it will be readily seen should the insert be removed 3 3 3 3 3 If appropriate install the damper sealing plate according to t...

Page 12: ...rough the flex pipe at the three pilot hole locations in the adaptor and secure with sheet metal screws Installing the Fireplace Insert Power Cord Orientation 1 Determine to which side the blower powe...

Page 13: ...uir equired ed ed ed ed 10 mm socket or wrench 5 If appropriate attach the Extended Surround Panel to the firebox See illustration on page 6 With the painted side facing out engage the hooked tabs on...

Page 14: ...rting or reviving the fire the control lever should be set at the far right position to allow the maximum amount of air into the stove See fig 15 After the fire is well established the lever should be...

Page 15: ...y flue and connector pipe cleaned and inspected at the beginning of the heating season and then inspected twice per month during frequent use Clean the chimney whenever creosote accumu lation of 1 4 o...

Page 16: ...mperature and height all affect draft which in turn affects the formation of creosote An exterior chimney whether masonry or prefabricated steel will be exposed to cold outside temperatures and conseq...

Page 17: ...of by burial in soil or otherwise dispersed the the the the they should be k y should be k y should be k y should be k y should be kept ept ept ept ept in in in in in the the the the the closed c clos...

Page 18: ...liner and chimney can now be inspected and cleaned 9 See page 12 for reassembly procedures Gaskets Check door and glass gaskets for seal integrity The gaskets should be soft enough to be somewhat res...

Page 19: ...ngth Trim the gasket to leave 1 excess 3 Apply a small bead of gasket or furnace cement in the channel 4 Lightly press the new gasket into the channel being careful to avoid compressing or stretching...

Page 20: ...rica 55 Hutcherson Dr Gorham Maine 04038 Figure 20 J tul C 550 Rockland Illustrated Parts Diagram 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 12 23 24 25 28 27 26 29 30 12 31 32 33 34 35 36...

Page 21: ...ooden Knob Replacement Kit 151991 88 Handle Asy Complete Matte Black Paint 156320 Handle Asy Complete Nickel Plated 156021 89 Airwash Manifold inc gasket Matte Black Paint 156710 Airwash Manifold inc...

Page 22: ...alue of the proposed alternate floor protector a Use the formula in Step 1 to convert values not expressed as R b For multiple layers add R values of each layer to determine overall R value c If the o...

Page 23: ...156448 J tul C 550 Replacement Assemblies Front Plate Asy inc gasket Matte Black Paint 156482 Front Plate Asy inc gasket Blue Black Enamel 156483 Front Plate Asy inc gasket J tul Iron Paint 156484 Fr...

Page 24: ...lations It is important that the these instructions be carefully read and understood before beginning the installation J tul pursues a policy of continual product development Consequently products may...

Reviews: