![Johnson J2R4SUC 2007 Service Manual Download Page 88](http://html1.mh-extra.com/html/johnson/j2r4suc-2007/j2r4suc-2007_service-manual_2022851088.webp)
86
POWERHEAD
CYLINDER HEAD
Installation
Insert the dowel pins and place a new cylinder
head gasket into position on cylinder.
Position cylinder head assembly on cylinder.
Apply engine oil to cylinder head bolts. Lightly
seat all cylinder head bolts.
Tighten bolts in two steps according to tightening
order.
•
First torque: 5.0 ft. lbs. (7 N·m)
•
Final torque: 9.5 ft. lbs. (13 N·m)
Install the push rods onto the cam rocker arms.
Install the rocker arms and the rocker arm shaft.
Adjust the valve clearance. Refer to
VALVE
CLEARANCE
on p. 46.
Install the cylinder head cover and the gasket,
then tighten the four cylinder head cover bolts
according to tightening order to torque of 5.0 ft.
lbs. (7 N ·m).
1.
Dowel pins
2.
Gasket
006016
Torque Sequence
006017
1
2
1
3
5
2
4
1
1.
Push rod (2)
2.
Cam rocker arms
006019
006020
1.
Rocker arm (2)
2.
Rocker arm shaft
006021
Torque Sequence
006022
2
1
2
1
1
2
3
4