![Johnson Controls York YHAU-C Installation, Operation And Maintenance Manual Download Page 105](http://html1.mh-extra.com/html/johnson-controls/york-yhau-c/york-yhau-c_installation-operation-and-maintenance-manual_2023471105.webp)
Figure 51: Sequential operation flowchart
Note:
a. Implement sequential operation of the chilled water pump and the cooling water
pump from the chiller.
b. If there is one air conditioner, secure interlock for the air conditioner operation (the
part indicated by broken lines).
c. Implement sequential operation in such a way that when the chilled water pump
stops, the cooling water pump also stops.
d. If the chilled and cooling water system is the common system, install the isolation
valve on the chilled water and cooling water inlet pipe entering the chiller, and
interlock these isolation valves with the chiller control panel. It is important for safe
and reliable operation of the chiller and to prevent potential crystallization of lithium
bromide solution and freezing of the evaporator tubes.
103
YHAU-C Single Effect Steam-Fired Absorption Chiller
Summary of Contents for York YHAU-C
Page 2: ......
Page 33: ...Figure 11 Location of rupture disk 31 YHAU C Single Effect Steam Fired Absorption Chiller...
Page 103: ...Figure 49 Cooling start diagram 101 YHAU C Single Effect Steam Fired Absorption Chiller...
Page 104: ...Figure 50 Cooling stop diagram YHAU C Single Effect Steam Fired Absorption Chiller 102...
Page 166: ...Figure 73 Steam and drain system YHAU C Single Effect Steam Fired Absorption Chiller 164...
Page 167: ...Figure 74 Duhring diagram PTX chart F 165 YHAU C Single Effect Steam Fired Absorption Chiller...
Page 168: ...Figure 75 Duhring diagram PTX chart C YHAU C Single Effect Steam Fired Absorption Chiller 166...