JWS-3 Embedded Installation
Installing a CHS-4L Chassis
16
JWS-3 Installation and Operation Manual - P/N: 53550:Rev: A1 1/12/10
2.4 Installing a CHS-4L Chassis
A chassis holds the gateway within a CAB-3/CAB-4 series cabinet. A CHS-4L chassis fits into any
CAB-3/CAB-4 series cabinet row except for the bottom row, which provides battery housing and
does not have PEM studs for mounting. Follow these instructions to install a CHS-4L chassis in a
CAB-3/CAB-4 series cabinet.
Step 1. Position the chassis so the PEM cabinet studs are aligned with the chassis mounting holes,
and mount the chassis onto the cabinet.
Step 2. Secure the chassis to the PEM studs with the two hex nuts (PN 36047) provided with the
chassis.
Figure 2.3 Installing a CHS-4LChassis
PEM Studs
Hex Nuts