210.100-IOM (JUL 2021)
Page 3
AcuAir Hygienic Air Units
Installation - Operation - Maintenance
Table of Contents
Safety ................................................................................ 5
Warranty ........................................................................... 5
Pre-installation requirements ............................................ 7
Preliminary field piping design considerations
................................................... 9
Storage ............................................................................. 9
Indoor storage .............................................................. 9
Outdoor storage ........................................................... 9
Long-term storage ....................................................... 9
Lifting and handling .................................................... 10
......................................... 11
Section reconnect ship loose items
................................ 14
Installation tools .............................................................. 14
Assembling roof curb (optional)
................................. 14
Installing roof curb ..................................................... 14
.......................................... 14
Removable lifting lugs ..................................................... 14
............................................. 14
Performance Grade connections ..................................... 15
Reassembling split unit, Performance Series only
Installing and sealing the reconnection attachment ........ 16
Insulating the base reconnect seam of an AcuAir
Performance Series unit ........................................... 17
Sealing the AcuAir Performance Series roof ................... 19
Food Grade connections ................................................. 20
Installing the reconnect ................................................... 20
Applying the AcuAir Food Grade roof reconnect finish
Insulating the base reconnect seam of an AcuAir Food
Grade Series unit ..................................................... 23
Foam kit 15 use guidelines for
AcuAir unit base reconnect insulation ...................... 24
.................................................. 24
Attaching the AcuAir fresh air intake plenum
........................................... 28
.................................................... 28
................................................ 28
Duct connections ............................................................ 29
Connecting the weather hood directly to the AcuAir
...................................................... 30
Field penetrations for piping and electrical connections
Tools required ............................................................ 30
Filter latches ................................................................... 31
..................................................... 34
Non-HEPA filters in HEPA frames
.................................... 34
Installing a 4 in. pleated panel (pre)filters
............................................. 35
Installing latches ........................................................ 35
..................................................................... 37
.......................................................................... 39
................................................................. 39
................................................................... 39
................................................. 39
New belt run-in .............................................................. 39
....................................................... 40
Start-up after prolonged shutdown
................................... 40
Daily operation and routine maintenance
Maintaining the coils ....................................................... 41
................................................. 41
General maintenance .................................................. 41
................................................... 41
.................................................... 41
Maintaining the filters ..................................................... 42
Finish and sealing ....................................................... 42
Electrical conduit sealing requirement ............................ 42
Calibrating the temperature sensors
............................... 43
Ice bath ..................................................................... 43
.................................... 43
Unit cleaning and sanitation ............................................ 43
White rust and wet storage stain of galvanized steel
Lubricating the fan bearing ............................................. 44
Fan segment-fan motor .................................................. 44
Mounting hardware and adjustable motor base ......... 45
............................................. 45
Inspecting V-belts and sheaves
....................................... 46
........................................... 46
Alignment using a straightedge (preferred)
Alignment using a string ............................................. 46
........................................................... 47
Tensioning V-belts and sheaves
...................................... 47
...................................... 48
Operating and maintenance instructions for piezometer
.......................................... 48
........................................ 48
Monthly service ............................................................... 48
....................................... 48
Maintenance intervals ..................................................... 49
...................................................................... 50
Troubleshooting .............................................................. 51
AcuAir factory start-up assistance
.................................. 52
AcuAir air handler prestart-up checklist
Prestart-up check (for site records)