9
sloped land
≥
20
°
.
Chapter IV. Installation Method
Assembly after unpackaged:
1.1.
Walking round
Fix the body of tiller, install wheels on both sides of hexagonal shaft and fix it by clip B and Pin.
1.2 Armrest frame
Install Armrest: Put the bolt of armrest plate into the hole on rotary plate, and then lock those
tight with press gasket, wave washer and nut.
1.3 Fix handle cover on the rotary plate with Bolt M6x12.
1.4 Checking the tiller, attached components if it exists lack, then go for next step following this
manual.
Chapter V. Operation introduction
Before sending the tiller out of factory, adjusting and debugging is done, for comfortable and
easier using, the user should inspect and adjust it again.
1. Daily Checking
1.1
Check all the bolts in the connecting part ensure all of them are tightening.
1.2
Checking the handles (throttle, Clutch and gear shifting lever), make them flexible and
in the correct position.
1.3
Put the shift lever in the neutral gear place.
1.4
Add oil:
○
1
Add lube oil (SAE10W-30) to crankcase as Photo III shows;
○
2
Put the engine at horizontal position. Insert the dipstick into the filler neck without
screwing it in. Get the dipstick out, check the oil level. The oil level should be the
mentioned position in the dipstick. (Look at Photo III).
○
3
Refuel air cleaner with oil, disassembling the synthetic glass cover tent below the
cleaner, and refuel 0.1L No.20 oil.
1.5
Add fuel; add No. 90 petrol to fuel tank.
1.6
Make preparation following the user manual before starting machine.
Photo III
Upper level
Lower lever