·
64
·
FIG. 5-4 The installation of the hanging boardStep
3: Lock the expansion bolt until the expansion bolt is attached
to the wall.Put on photovoltaic inverter.
FIG. 5-5 Completion effect of installation
14 Electrical Connection
The electrical connection can be carried out when the mechanical installation
of inverter is completed. The following operation specification must be
followed when making electrical connection.