SECTION 5 - EMERGENCY PROCEDURES
31215027
5-5
Jib Up
1.
Install the spool plug in the location shown.
2.
Install the handle into the hand pump and pump the handle
until the desired platform position is reached.
3.
Remove the handle from the hand pump.
Jib Down
1.
Install the spool plug in the location shown.
2.
Install the handle into the hand pump and pump the handle
until the desired platform position is reached.
3.
Remove the handle from the hand pump.
REMOVE ALL SPOOL PLUGS BEFORE RETURNING UNIT TO SERVICE.
OAC03194
OAC03195
To
order
go
to
Discount-Equipment.com