SECTION 2 - PROCEDURES
2-46
– JLG Sizzor –
3120826
2.30 PREVENTIVE MAINTENANCE AND
INSPECTION SCHEDULE
The preventive maintenance and inspection checks are
listed and defined in the following table. This table is
divided into two basic parts, the “AREA” to be inspected
and the “INTERVAL” at which the inspection is to take
place. Under the “AREA” portion of the table, the various
systems along with the components that make up that
system are listed. The “INTERVAL” portion of the table is
divided into five columns representing the various inspec-
tion time periods. The numbers listed within the interval
column represent the applicable inspection code for
which that component is to be checked.
The checks and services listed in this schedule are not
intended to replace any local or regional regulations that
may pertain to this type of equipment nor should the lists
be considered as all inclusive. Variances in interval times
may occur due to climate and/or conditions and depend-
ing on the location and use of the machine.
JLG Industries requires that a complete annual inspection
be performed in accordance with the “Annual Machine
Inspection Report” form. Forms are supplied with each
new machine and are also available from JLG Customer
Service. Form must be completed and returned to JLG
Industries.
JLG INDUSTRIES REQUIRES THAT A COMPLETE ANNUAL
INSPECTION BE PERFORMED IN ACCORDANCE WITH THE
“ANNUAL MACHINE INSPECTION REPORT” FORM.
NOTE: This machine requires periodic safety and mainte-
nance inspections by a JLG Dealer. A decal located
on the frame affords a place to record (stamp)
inspection dates. Notify dealer if inspection is over-
due.
The inspection and maintenance code numbers are as fol-
lows:
1.
Check for proper and secure installation.
2.
Check for visible damage and legibility.
3.
Check for proper fluid level.
4.
Check for any structural damage; cracked or broken
welds; bent or warped surfaces.
5.
Check for leakage.
6.
Check for presence of excessive dirt or foreign
material.
7.
Check for proper operation and freedom of move-
ment.
8.
Check for excessive wear or damage.
9.
Check for proper tightness and adjustment.
10.
Drain, clean and refill.
11.
Check for proper operation while pump/motor is
running.
12.
Check for proper lubrication.
13.
Check for evidence of scratches, nicks or rust and
for straightness of rod.
14.
Check for condition of element; replace as neces-
sary.
15.
Check for proper inflation.
16.
Check Inspection Decal for current inspection
stamp.
Summary of Contents for 25RTS
Page 2: ......
Page 8: ...TABLE OF CONTENTS iv JLG Sizzor 3120826 This page intentionally left blank...
Page 11: ...SECTION 1 SPECIFICATIONS 3120826 JLG Sizzor 1 3 Figure 1 1 Torque Chart...
Page 12: ...SECTION 1 SPECIFICATIONS 1 4 JLG Sizzor 3120826 Figure 1 2 Lubrication Diagram...
Page 36: ...SECTION 2 PROCEDURES 2 20 JLG Sizzor 3120826 Figure 2 21 Pressure Adjustment Locations 2 W S...
Page 38: ...SECTION 2 PROCEDURES 2 22 JLG Sizzor 3120826 Figure 2 24 Pressure Adjustment Locations 4 W S...
Page 42: ...SECTION 2 PROCEDURES 2 26 JLG Sizzor 3120826 Figure 2 26 Piston Drive Motor...
Page 52: ...SECTION 2 PROCEDURES 2 36 JLG Sizzor 3120826 Figure 2 27 Drive Torque Hub 2WD 4WD Rear...
Page 56: ...SECTION 2 PROCEDURES 2 40 JLG Sizzor 3120826 Figure 2 28 Drive Torque Hub Brake 4WD Front...
Page 59: ...SECTION 2 PROCEDURES 3120826 JLG Sizzor 2 43 Figure 2 29 Drive Brake 2WD 2WS...
Page 64: ...SECTION 2 PROCEDURES 2 48 JLG Sizzor 3120826 This page left blank intentionally...
Page 82: ...SECTION 3 TROUBLESHOOTING 3 18 JLG Sizzor 3120826 This page intentionally left blank...
Page 83: ......