SECTION 3 - USER RESPONSIBILITIES AND MACHINE CONTROL
3-2
– JLG Lift –
3120854
Capacities
Raising platform with or without any load in platform,
is based on the following criteria:
1.
Machine is positioned on a smooth, firm and level
surface.
2.
Load is within manufacturer’s rated capacity.
3.
All machine systems are functioning properly.
Stability
This machine, as originally manufactured by JLG and
operated within its rated capacity on a smooth, firm and
level supporting surface, provides a stable aerial platform
for all platform positions.
3.4
CONTROLS AND INDICATORS FOR NON
PROPORTIONAL CONTROL
Battery Charger
NOTE:
If batteries are run down to under 6 volts, the sup-
plied battery charger will not pick up the charge.
The battery charger is located in the right side battery
door. The charger is a 20 Amp, SCR-style charger
equipped with a manual switch that allows the operator to
select 110-125 Volt input or 220-250 Volt input. A rocker
switch circuit breaker is included to reset the charger in
the event of a loss of power. LED’s on the front panel of
the charger indicate the status of charger operation
(Charge Complete, 80% Charge, Incomplete Charge,
Charger On, Abnormal Cycle)
Ground Control Station
DO NOT OPERATE FROM GROUND CONTROL STATION WITH
PERSONNEL IN THE PLATFORM EXCEPT IN AN EMERGENCY.
PERFORM AS MANY PRE-OPERATIONAL CHECKS AND INSPEC-
TIONS FROM THE GROUND CONTROL STATION AS POSSIBLE.
REFER TO SECTION 2 FOR PRE-OPERATIONAL CHECKS AND
INSPECTIONS.
.
Figure 3-1. Ground Control Station