SECTION 3 - USER RESPONSIBILITIES & MACHINE CONTROLS
3-10
– JLG Lift –
3120751
Figure 3-9. Decal Locations (Right/Left View)
P/N-1703072
P/N-1703636
P/N-3252311
(20VP UL-EE OPTION)
P/N-1703708
BRAKE
1703636
FREE
WHEELING
BRAKE HANDLE MUST
BE IN “FREE-WHEELING“
POSITION & GROUND
STATION KEY
SWITCH MUST BE
IN “OFF” POSITION
BEFORE TOWING OR
WINCHING MACHINE
TOW OR WINCH
SLOWLY:
2 MPH MAX.
1703708
BATTERY I NFORM ATI ON
AMP HR (20 HR RATE)
VOLTAGE
BATTERY
DIMENSIONS
3252331
BATTERY I NFORM ATI ON
AMP HR (20 HR RATE)
VOLTAGE
BATTERY
DIMENSIONS
3252331
Summary of Contents for 10VP
Page 2: ...JLG Lift...
Page 4: ...This page intentionally left blank...
Page 8: ...EFFECTIVITY PAGE d JLG Lift 3120727 This page intentionally left blank...
Page 22: ...SECTION 2 PREPARATION AND INSPECTION 2 8 JLG Lift 3120727 Figure 2 6 Torque Chart...
Page 44: ...SECTION 5 OPTIONAL EQUIPMENT 5 4 JLG Lift 3120727 This page intentionally left blank...
Page 50: ......
Page 51: ......