18
WARNING
!
ELECTRICAL SCHEMATIC
JH INDUSTIRES INC.
Before doing any electrical work, make certain
the power is disconnected and properly tagged
or locked off. All electrical work must be done
by a qualified technician and meet all applicable
codes. If it s necessary to make trouble
shooting checks inside the control box with the
power on, USE EXTREME CAUTION. Do not
place your fingers or un-insulated tools inside
the control box. Touching wires or other parts
inside the control box could result in electrical
shock, death or serious injury.
FIGURE #17
– Electrical Schematic
Summary of Contents for Copperloy
Page 2: ......
Page 22: ...20 WARNING LABELS JH INDUSTIRES INC 1 2 3 5 4 7 ...
Page 25: ...23 STANDARD PARTS LIST JH INDUSTIRES INC ...
Page 26: ...36 JH INDUSTIRES INC NOTES ...
Page 27: ...37 JH INDUSTIRES INC NOTES ...