FRL
32
JETYD Operations Manual
Figure 20. Adjusting FRL Regulator
2.
A Torque Chart is provided with each tool which gives the conversion from air pressure
(PSI) to torque (ft-lbs and N-m). Use the chart to determine the air pressure needed to
achieve desired torque output.
3.
Connect your air supply to the FRL, and press the ON button to view current air pressure.
4.
While operating the tool, turn the regulator knob clockwise to decrease pressure and
counter-clockwise to increase pressure. Allow 30 seconds for the digital gauge to settle.
Filling the Lubricator Reservoir
To fill the lubricator reservoir:
1.
Push the black square button down to unlock the reservoir.
2.
Twist the lubricator reservoir until the two lines on the lubricator body and the lubricator
reservoir are aligned.
3.
Pull the lubricator reservoir down to detach it from lubricator body.
4.
Pour pneumatic tool oil into the reservoir until it is about two-thirds full.
5.
To reattach the lubricator, realign the lines on the lubricator reservoir and main body,
then push the two pieces together and twist the reservoir to lock in place.