Paint
It is strongly recommended that the fire is protected from cement and plaster splashes during installation, as
these are difficult to remove from the surfaces.
Modular Construction
Due to the modular construction of the unit, you can for instance:
Fit the flue connector, air supply pipes and the outer box. The rest of the components can be kept in safe storage
while all rough building and finishing work is being completed. At the final stage, the engine and finishing frame
can be fitted.
This way there is less chance of aesthetic damage, or accidental damage to important components while building
work is in process.
Installation Requirements
Any under floor vents or openings
within
the builders opening should be sealed off.
The surface of the hearth and fireplace floor must be sufficiently flat to ensure that a good seal with the outer
firebox can be made and to enable the finishing frame to fit. Any excessive unevenness (uneven tiles, stone,
etc.) should be rectified.
The front face of the fireplace should be reasonably flat over the area covered by the outer firebox top and side
flange seals to ensure good sealing. These faces should be made good if necessary.
The appliance must not stand on combustible materials or carpets.
Unpacking
The fire and the following components are packed in several cartons. Take care when unpacking the fire to avoid
accidental damage. Particular care should be taken with the glass door and the air control mechanism.
Ensure that all the listed items are present before commencing installation.
l
Firebox consisting of an outer box and an inner firebox
l
Finishing Frame
l
Flue Adaptor
l
Roll of Insulation
l
Door operating tool
l
13mm Spanner to remove tertiary air tubes
l
Installation & Operating Instructions
l
Guarantee card
INNER BOX
OUTER BOX
FINISHING FRAME
FLUE ADAPTOR
DOOR
OPERATING
TOOL
7
Summary of Contents for INSET STOVE MKIII 60i
Page 35: ...35...