7
Unpacking and Cleanup
Contents of Shipping Cartons
Note: Unit shipped in two cartons.
Stand Carton
1 Stand with Motor
1 Stand
Door
1 Dust Chute with Mounting Hardware
1 Pedestal Switch with Mounting Hardware
(JJ-8HH only)
Main Unit Carton
1 Bed
Assembly
1 Fence
Assembly
1 Cutterhead
Guard
1 Belt
Guard
2 V-Belts
2 Handwheels
with
handle
1 Fence
Handle
3 Mounting Bolts
3 3/8"
Lock
Washers
1 Operating Instructions and Parts Manual
1 Warranty
Card
Tools Included with JJ-8CS
1 12/14mm Open End Wrench
1 8/10mm Open End Wrench
3 Hex Wrenches (3, 4 and 5 mm)
1 Knife
Gauge
Assembly
Tools included with JJ-8HH:
1 12/14mm Open End Wrench
1 8/10mm Open End Wrench
4 Hex Wrenches (3, 4, 5, 6 mm)
2 Star Point Screwdrivers
5 Knife
Inserts
10 Knife Insert Screws
Tools Required for Assembly:
#1 Cross Point Screwdriver
6-8” Adjustable Wrench or 17 & 19mm Wrench
Unpacking and Cleanup
1. Carefully finish removing all contents from
both shipping cartons. Compare contents of
the shipping cartons with the list of contents
above. Place parts on a protected surface.
2. Set packing material and shipping cartons to
the side. Do not discard until machine has
been set up and is running properly.
3. Clean all rust protected surfaces (bed,
fence, etc.) with kerosene or diesel oil. Do
not use gasoline, paint thinner, mineral
spirits, etc. These may damage painted
surfaces.