27
8.
Or pull out the drive & idle shafts by hitting with soft mallet
the
rear-end of each shaft on the gasket face of the Gearbox.
9.
Remove the bearings and spacers (16) together from the
shafts by pressing the shaft separated with them. Or remove
bearings by puller shown in Figure 36.
10.
The taper roller bearings for ZL400 series must be kept
together with in-outside spacer and separated for drive & idle
shafts.
Fig. 35
Fig. 37
Fig. 36
Summary of Contents for JRZL Series
Page 1: ...Operating Maintenance Manual JEC JRZL Series Rotary Lobe Pumps...
Page 6: ...5...
Page 7: ...6...
Page 8: ...7...
Page 9: ...8...
Page 10: ...9...
Page 11: ...10...
Page 34: ...33 PARTS LIST EXPLODED VIEW ZL100 ZL200 AND ZL300...
Page 58: ...57 EXPLODED VIEW ZL400...