45/162
OPERATION
ANCHORING BY HAND WITH USE OF A MANUAL WINDLASS
- Release the windlass brake using the handle located in the chain locker so as to allow the
chain lifter to turn freely and to release the anchor from the stem fitting
- Re-engage the brake and let the anchor hang until the mooring position is reached.
- Have the boat pointed into the wind and without speed.
- Release the brake and pay out the chain slowly.
- Control the speed of anchor lowering using the brake.
- Once the anchor has taken hold re-engage the brake and secure the hawser to the cleat.
HEAVING UP THE ANCHOR
- Lock the cable lifter snubber.
- Ensure the chain is properly set on the cable lifter.
- Slowly go near the anchor, using your engine (Don't use your windlass to winch the boat).
- Heave the anchor completely.
- Visually check the last meters till the anchor gets into contact with the davit.
- If you just change berth, check the position of the anchor on the stem fitting.
- For sailing, store the anchor in the chain locker or fasten the anchor to its roller.
- For electrical windlasses cut off the power supply as soon as the anchor has been lifted.
The winch is powered by battery park easements.
Turn on the boat engine.
Relay box
Location: Sail locker
100A breaker
4
DECK
Summary of Contents for Sun odyssey 509
Page 1: ...SUN ODYSSEY 509 OWNER S MANUAL C ROISIERE 134614 Index C...
Page 2: ......
Page 4: ......
Page 7: ...3 162 HISTORY OF UPDATES Index A 11 2011 Index B 06 2012 Index C 08 2012...
Page 8: ......
Page 10: ......
Page 16: ......
Page 27: ...23 162 Emergency exits in case of fire Companionway Deck hatch of the fore cabin 2 SAFETY...
Page 28: ......
Page 30: ...26 162 FUEL SUPPLY VALVE Access...
Page 34: ......
Page 36: ...32 162 USE STEERS FRANK OF HELP Sector access port Opening access hole Tiller in position...
Page 38: ......
Page 39: ...35 162 HULL MAINTENANCE OF THE HULL LIFTING 3...
Page 42: ......
Page 53: ...49 162 STEERING SYSTEM STEERING GEAR LOCATION SCHEMATIC DIAGRAM 5...
Page 54: ...50 162 STEERING GEAR Access Aft cabins Sheaves Ropes Steering sector...
Page 56: ...52 162 LOCATION SCHEMATIC DIAGRAM...
Page 57: ...53 162 LOCATION 5 STEERING SYSTEM...
Page 58: ...54 162 LOCATION...
Page 60: ......
Page 62: ...58 162 STANDING RIGGING 1 2 3 4 5 6...
Page 81: ...77 162 INTERIOR INTRODUCTION INTERIOR MAINTENANCE MAINTENANCE OF FABRICS 7...
Page 86: ......
Page 94: ...90 162 FORE WASHROOM Shower draining Drain plug Shower draining Control Drainage Shower pump...
Page 100: ......
Page 101: ...97 162 ELECTRICAL EQUIPMENT GENERAL INFORMATION 12 V DC SYSTEM 110 220 V AC SYSTEM EQUIPMENT 9...
Page 104: ......
Page 123: ...119 162 ENGINE GENERAL INFORMATION ENGINE FITTING 10...
Page 128: ...124 162 DIAGRAM LOCATION...
Page 129: ...125 162 DIAGRAM LOCATION 10 ENGINE...
Page 130: ...126 162 DIAGRAM LOCATION...
Page 131: ...127 162 DIAGRAM LOCATION 10 ENGINE...
Page 132: ...128 162 DIAGRAM LOCATION...
Page 134: ......
Page 136: ...132 162 SUPPLY VALVE FUEL Fuel supply valve...
Page 154: ...150 162 10 Layout diagram...
Page 157: ...153 162 LAUNCHING LAUNCHING RECOMMENDATIONS STEPPING THE MAST 11...
Page 161: ...157 162 WINTER STORAGE LAYING UP PROTECTION AND MAINTENANCE 12...
Page 164: ......
Page 166: ......