- 25 -
137132
Index B
.
5.2 STANDING RIGGING
Reference
Designation
1
Ba
Bridle
2
Forestay
3
Lower - Forestay
4
V1
5
V2D3
6
D1
7
D2
- To hoist a crew member up to the top of the mast, make a bowline with the
halyard directly on the bosun's chair ring (never use the halyard snap shackle
or shackle).
- Never hoist a crew member when sailing in heavy weather.
ADVICE-RECOMMENDATION
- The initial commissioning of your boat will require a lot of skill and care. The proper
working of all your boat's equipment is the result of the quality of the commissioning
operations.
For this reason the stepping of the mast must be carried out under the responsibility of your
dealer the first time the mast is stepped.
- Before each trip, carefully inspect the mast from top to bottom.
- Periodically check the rig tension and the tightness of the locknuts and bottle screw clevis
pins.
5
R
IG
G
IN
G
A
N
D
S
A
IL
S
Summary of Contents for SUN ODYSSEY 41 DS
Page 1: ...137132 Index B SUN ODYSSEY 41 DS OWNER S MANUAL...
Page 2: ......
Page 10: ......
Page 16: ......
Page 20: ......
Page 40: ...40 137132 Index B 30 31 32 33 34 35...
Page 46: ......
Page 52: ......
Page 60: ...60 137132 Index B Layout diagram Battery cables...
Page 70: ...70 137132 Index B 8 3 3 Installation of hull AC wiring loom...
Page 76: ......
Page 86: ......
Page 90: ......
Page 96: ...96 137132 Index B Please refer to the key on the following page...
Page 129: ...129 137132 Index B SINK ICEBOX DRAINAGE Control Icebox drainage Access 13 WATER SYSTEMS...
Page 138: ...138 137132 Index B B 9 A 01 02 03 04 05 06 09 08 07 07 10 11 12...
Page 158: ...158 137132 Index B 15 2 LAYOUT DIAGRAM...
Page 159: ...159 137132 Index B 15 STEERING SYSTEM...
Page 160: ...160 137132 Index B...
Page 161: ...161 137132 Index B 15 STEERING SYSTEM...
Page 162: ...162 137132 Index B...
Page 186: ......
Page 188: ......