SAFETY EQUIPMENTS
WARNING
Check the safety equipments inventory before each trip
RECOMMENDATION / LIFE RAFT
The life raft is located in the cockpit locker.
The locker shall never be padlocked at sea.
The launching procedure is indicated on the raft and should be read carefully before
taking to sea.
SAFETY DIRECTIONS CONCERNING THE GAS STOVE
The gas cylinder is located in thestarboardt cockpit locker.
Type: "Camping-Gaz" (butane, duty pressure: 142 lbs per sq. inch)
- Shut the valves in the system (in the locker behind the sink) and on the cylinder
when the appliances are not in use. Shut immediately all valves in case of hazard (fig.1),
- Never leave appliances burning unattended,
- Ensure that the appliances valves are shut before opening the cylinder,
ÉQUIPEMENT DE SÉCURITÉ
AVERTISSEMENT
Faites l’inventaire des équipements de sécurité obligatoire avant chaque départ.
RECOMMANDATION / RADEAU DE SURVIE
Le radeau de survie est situé dans le coffre de cockpit.
Ce coffre ne doit jamais être cadenassé pendant la navigation.
La procédure de mise à l'eau est indiquée sur le radeau. Il est important d'en prendre
connaissance avant de prendre le départ.
CONSIGNES DE SECURITE RELATIVES AU CIRCUIT GAZ
La bouteille de gaz se trouve dans le coffre tribord de cockpit.
Type: "Camping-Gaz" (butane, pression de service: 10 kg/cm
2
)
- Fermer les vannes sur le circuit (dans le coffre derrière l’évier) et sur la
bouteille quand les appareils ne sont pas utilisés. Fermer immédiatement
toutes les vannes en cas de danger.(fig1)
- Ne jamais laisser un appareil en fonctionnement
sans surveillance.
- S'assurer que les vannes des appareils sont fer
mées avant d'ouvrir la vanne de la bouteille.
14/87
2
indice 0
Figure 1
Summary of Contents for SUN FAST 32i
Page 4: ......
Page 5: ...G N RALIT S GARANTIE GENERAL POINTS WARRANTY 1 4 87 indice 0...
Page 6: ......
Page 8: ......
Page 16: ......
Page 17: ...S CURIT 5 3 5 5 5 6 iso 10240 SAFETY 2 13 87 indice 0...
Page 24: ......
Page 25: ...COQUE 5 3 5 4 5 5 iso 10240 HULL 3 20 87 indice 0...
Page 30: ......
Page 31: ...PONT 5 3 5 4 5 5 iso 10240 DECK 25 87 4 indice 0...
Page 32: ...PLAN DE PONT DECK LAYOUT 5 3 1 iso 10240 26 87 4 indice 0...
Page 41: ...GR EMENT ET VOILURE RIG AND SAILS 5 3 5 4 5 5 iso 10240 35 87 5 indice 0...
Page 54: ......
Page 55: ...EMM NAGEMENTS ACCOMODATIONS 5 3 5 4 5 5 iso 10240 6 48 87 indice 0...
Page 56: ...EMM NAGEMENTS ACCOMODATIONS 5 3 1 iso 10240 49 87 6 indice 0...
Page 60: ......
Page 61: ...PLOMBERIE PLUMBING 5 3 5 5 5 6 iso 10240 7 53 87 indice 0...
Page 71: ...CIRCUITS LECTRIQUES WIRING 5 3 5 4 5 5 5 6 iso 10240 8 63 87 indice 0...
Page 75: ...MOTEUR ENGINE 5 3 5 4 5 5 5 6 iso 10240 9 67 87 indice 0...
Page 83: ...MISE L EAU LAUNCHING 5 2 5 3 5 4 iso 10240 10 75 87 indice 0...
Page 91: ...HIVERNAGE 5 3 5 4 5 5 iso 10240 LAYING UP AND WINTER PRECAUTIONS 11 83 87 indice 0...