background image

 

HST Optical Ethernet Quick Card 

 

The document describes how to test Optical Ethernet links using the HST-3000 and Fiber 
Inspection and Cleaning Gear.  
 

1  Proper Method for Cleaning Fibers 

Step 

Directions 

 

Install the correct bulkhead or patch cord tip to the 
probe microscope. 
 
Note: Standard Tips require barrel assempbly 
 
 

 

Insert the probe into the bulkhead or attaché the patch 
cord to inspect.

 

 

Press the Results key to display the results of the scope image 

Turn the focus control on the probe to focus the image on the display. 

There should not be any dirt on the image.  If there is 
dirt, clean the fiber and then reconnect the fiber.  If 
one is not certain if the fiber is acceptable, clean the 
fiber and then repeat this step to ensure there is no 
back reflection or unnecessary attenuation on the link. 

     

 

          Pass                        Fail 

If needing to clean the fiber, use an IBC cleaner and 
remove the tip before cleaning. 

 

 

Insert the IBC cleaner into the bulkhead and patchcord 
until you clear a click two times for each piece of gear. 

 

 

Summary of Contents for IP Video Test Option HST-3000

Page 1: ...lts key to display the results of the scope image 4 Turn the focus control on the probe to focus the image on the display 5 There should not be any dirt on the image If there is dirt clean the fiber a...

Page 2: ...erminate 2 The unit will now boot up Make sure to insert the proper SFP into the R T 1 slot top left of the unit The proper SFP will be either a 1310nm or 850nm optical SFP depending on the handoff 3...

Page 3: ...se do so at this time 2 Press the configure button Tap the left and right arrows until you get to the Summary Settings Screen Then Select Loop Type Broadcast Tx Payload Acterna Frame Length Random Enc...

Page 4: ...ct 2 Loop and then Select 1 Loop Up 8 You should see a message at the top stating Remote Loop Up Successful If you do not see this message please double check your settings If the message still does n...

Page 5: ...describes how to validate the link between two locations The output of this test is a go or no go on the quality of the link and the results can be saved for further analysis This section is expected...

Page 6: ...will change at each location but should be the CIR for the circuit 5 Tap right to select the Frame Length Tab Make sure that The smallest possible Frame Length is selected this will be either 64 68 70...

Page 7: ...9 Tap right to select the Frame Loss Make sure that Test Procedure RFC 2544 Trial Dur 60 sec Test Granularity 10 Mbps 10 Next press the home key Then select Restart 11 Now select the Action key and t...

Page 8: ...rn on the HST 3000 3 Press the System Navigation key and press the TOOLS soft key Press the Up Arrow or Down Arrow key to select File Manager then press the OK key to manage user files in the file sys...

Reviews: