background image

7.

Connect power supply. The instrument starts cool-
ing. The fan must run and the Peltier status LED 
must be illuminated red. The optional” temperature 
display shows “error 1”. After approx. 15 minutes 
the operating temperature is reached. The LED 
colour changes to green and the temperature dis-
play shows the actual temperature. As long the 
Peltier status indicator LED lights up red, the cur-
rent cooler temperature is not in the permissible 
range from 0…10°C. If the Peltier status LED 
blinks red, a temperature sensor defect is de-
tected. After the appliance has reached the oper-
ating conditions the gas flow can be introduced. 

NOTE

 

It is possible that there is remaining condensate from the 
factory test left in the cooler. (water) 
Keep in mind maximum flow rate of sample gas versus 
dew point at gas inlet. 

CAUTION

Non-compliance with the control steps can lead to seri-
ous hazards or property damage and personal injury! 
 
 

Operation 

8.

With the switch “PUMP” the sample gas pump can be 
turned on. 
 
The needle valve of the flow meter (option) allows regu-
lating the sample gas flow.  

 

CAUTION

Never close the needle valve completely to avoid dama-
ges. 
 

Temperature controller heated sample line 

9.

General

 

9.1.

The controller JPXE-4 can be used in combination with 
a heated sample gas line with RTD Pt100 or TC NiCrNi 
(depending on ordered configuration). If all relevant pa-
rameters are stated a used defined configuration may 
be ordered also. 
 
For operation it might only be necessary to change the 
set value SV for the temperature. All other parameters 
stay unchanged for the versions of 115 VAC and 230 
VAC supply voltage. 

Manual JCP-300 Series

7.

Energieversorgung herstellen. Das Gerät beginnt 
zu kühlen. Der Ventilator muss drehen und die 
Peltier Status LED leuchtet für ca. 15 min rot und 
die optionale Temperaturanzeige zeigt „error 1“. 
Wird die Betriebstemperatur erreicht wechselt die 
Peltier Status LED auf grün und die Temperatur-
anzeige zeigt die aktuelle Temperatur. Solange die 
Peltier Status LED rot leuchtet liegt die aktuelle 
Kühlertemperatur nicht im zul. Bereich von 0…
10°C. Blinkt die Peltier Status LED rot liegt ein 
Temperatursensor defekt vor. Nach Erreichen der 
Betriebsbedingungen kann das Gerät mit Gas be-
aufschlagt werden. 

HINWEIS 

Durch den werkseitigen Testlauf kann Restkondensat 
(Wasser) im Gaswärmetauscher zurückgeblieben sein.  
Max. Durchflussmenge in Abhängigkeit des Messgas-
Eingangstaupunktes beachten. 

VORSICHT

Bei nicht Einhaltung der Kontrollschritte kann es zu 
ernsthaften Gefährdungen oder zu Sach- und Personen-
schäden kommen! 
 

Betrieb 

8.

Mit dem Kippschalter „PUMP“ kann nun die Messgas-
pumpe eingeschaltet werden. 
Ist ein Durchflussmesser vorhanden, kann am Nadel-
ventil der gewünschte Messgasdurchfluss eingestellt 
werden. 
 

VORSICHT

Um Schäden zu vermeiden darf das Nadelventil niemals 
ganz geschlossen werden! 
 

Temperaturregler beheizte Messgasleitung 

9.

Allgemein

 

9.1.

Der Temperaturregler JPXE-4 kann in Kombination mit 
einer beheizten Messgasleitung mit Pt100 oder Thermo-
element NiCrNi (Abhängig von der bestellten Konfigura-
tion) betrieben werden. Unter Bekanntgabe aller 
relevanten Parameter Betriebesparameter können auch 
skundenspezifische Vorkonfigurationen bestellt werden. 
Für den Betrieb ist dann erforderlichenfalls nur die Soll-
temperatur (SV…Set Value) zu ändern. Alle anderen Re-
gelparameter bleiben für die Versionen bei 115 VAC und 
230 VAC Versorgungsspannung gleich. 

BA_DE_JCP-300_v1.0

          

–––––––––––––––––––––––––– [ 16 ] ––––––––––––––––––––––––––

Summary of Contents for JCP-300

Page 1: ...JCT ANALYSENTECHNIK GMBH BEDIENUNGSANLEITUNG OPERATING MANUAL 3 20 JCP 300...

Page 2: ...drain 12 6 5 Leakage test 14 6 6 Electrical connections 14 6 7 Connector plug terminal strip 14 7 Start up 15 8 Operation 16 9 Temperature controller heated sample line 16 9 1 General 16 9 2 Display o...

Page 3: ...d Die JCT Analysentechnik GmbH haftet nicht bei eigen m chtigen nderungen des Ger tes oder f r deren un sachgem e Handhabung oder Verwendung Wenn anzunehmen ist dass ein gefahrloser Betrieb des Ger te...

Page 4: ...ystemen bestimmt Beachten Sie die Angaben in den technischen Spezifikationen hinsichtlich Umge bungs und Versorgungsbedingungen sowie zul ssige Druck und Temperaturgrenzen Dieses Ger t darf nicht in e...

Page 5: ...aus einem zylindri schen Hohlk rper Die Gaswege im W rmetauscher sind so gestaltet dass das feuchte Gas in Kontakt mit der gek hlten Oberfl che tritt Aufgrund der Gasf hrung bilden sich sowohl lamina...

Page 6: ...s pump 3 6 The sample gas pump forwards the sample gas through erzeugter W rmetransport entzieht ber den Gasw r metauscher dem zugef hrten Messgas die Energie und f hrt diese durch die K hlrippen ab V...

Page 7: ...ng can be equipped with a temperature controller Manual JCP 300 Series aufbereitung zum nachgeschalteten Analysator Sie kann durch den Kippschalter in Betrieb gesetzt werden und ist durch die optional...

Page 8: ...with trolley function polypropylene yellow Gas wetted parts depending on heat exchanger aluminium coated PVDF SS316Ti FFKM Duran glass Dead volume per gas path 67 ml Connection sample gas inlet SS316...

Page 9: ...K1233009A Rollentr ger Kondensatpumpe K1233011 Laufband 17 00002 Filterelement Glasfaser 5 Stk 17 00003 Filterelement PTFE 3 Stk 17 90001 O Ring Dichtung Filtergeh use VPE 3 Stk 12 90431 Verschlei te...

Page 10: ...le gas inlet temperature 140 C Ersatzteile K1004600 Ventilator 230 VAC K1004605 Ventilator 115 VAC K1204323 Peltier Regelelektronik JPCU 1 K1204360 Kondensatw chter Elektronik KW 2 17 04000 Kondensats...

Page 11: ...sensor KW 1 Option 5 Condensate sensor KW 1 option Messgaspumpe Option 6 Sample gas pump option Feinstaubfilter Option 7 Fine dust filter option Durchflussmesser mit Nadelventil 8 Flow meter with need...

Page 12: ...ist das Ger t auf allf llige Trans portsch den zu untersuchen Wurde ein Schaden fest gestellt sind unverz glich die verantwortliche Spedition und der H ndler zu benachrichtigen Es ist zu berpr fen ob...

Page 13: ...e line Filterelement 3 Filter element Kondensatsensor KW 1 4 Condensate sensor KW 1 Durchflussmesser mit Nadelventil 5 Flow meter with needle valve Temperaturregler f r beheizte Messgasleitung 6 Tempe...

Page 14: ...g 6 5 VORSICHT Nach dem Anschluss ist die Dichtheit aller Schlauchver bindungen zu pr fen Elektrischer Anschluss 6 6 rtliche Netzspannung Netzfrequenz und Leis tungsaufnahme mit den Angaben am Typensc...

Page 15: ...schl sse VORSICHT Betriebsspannung und max zul ssige Stromaufnahme von 8A beachten Heizleitung nur spannungslos an schlie en VORSICHT Dieses Ger t wird mit Netzspannung betrieben Beim Betrieb stehen z...

Page 16: ...Manual JCP 300 Series 7 Energieversorgung herstellen Das Ger t beginnt zu k hlen Der Ventilator muss drehen und die Peltier Status LED leuchtet f r ca 15 min rot und die optionale Temperaturanzeige z...

Page 17: ...den am Ger t f hren BA_DE_JCP 300_v1 0 17 Betriebszustand Status Status LED Condensate Gr n 1 green 1 Status LED Condensate Rot 1 red 1 Status LED Condensate blinkt 1 blinking 1 Status LED Peltier Gr...

Page 18: ...arameter Wert werden angezeigt Dieser Modus erlaubt eine Einstellung von SV und des Alarmwertes 2 Dr cken der Block Taste um Setup Modus zu akti vieren Der Setup Modus erm glicht die Einstellung der P...

Page 19: ...tions Remove probe from process flange Manual JCP 300 Series 5 Einstellung des Temperatur Sensors Zwei Varianten von Temperatursensoren werden ge meinsam mit dem JPXE4 verwendet 2x dr cken um Setup Ch...

Page 20: ...iliar with the dangers involved Manual JCP 300 Series Anschluss des Kondensatablaufs trennen Fachgerechte Aufbewahrung bzw Entsorgung Recycling Das Ger t enth lt Bauteile die wiederverwertet werden k...

Page 21: ...geltenden Umwelt Sicherheits und tech nischen Richtlinien zu erfolgen Reinigen der K hllamellen 12 1 Zum Reinigen der K hllamellen den r ckw rtigen De ckel abnehmen und Lamellen mit Druckluft freibla...

Page 22: ...clockwise ro tation Schritt 2 Step 2 Die beiden Kondensat pumpen schl uche von den Fittings abziehen Pull off both condensate pump tubes from fittings Schritt 3 Step 3 Verschlussriegel im Uhrzeigersin...

Page 23: ...bands am Pumpenkopf montie ren und beide Enden einschnappen Mount the tubing cover on the pump head place both end parts in the rail until they snap in Schritt 6 Step 6 Verschlussriegel gegen den Uhrz...

Page 24: ...e two screws for pump head fixing and pull pump head with pulley holder off Schritt 2 Step 2 Pumpkopf mit neuem Rollentr ger auf Achse aufschieben Wellenschulter muss nach vorne zeigen Achten Sie dara...

Page 25: ...t gefroren Umgebungstemperatur 1 C ggf Betriebsraum beheizen Kondensat alarm Ursache beseitigen siehe feuchtes Messgas Kondensatsensor durch L sen der ber wurfmutter nach unten abziehen reinigen und t...

Page 26: ...DIN 34 Schutzvermerk nach DIN 34 beachten The technical data and design disclosed Analysentechnik GmbH and or contain propriertary rights of others and are not to be use sap 04 03 2020 Benennung P340...

Page 27: ...tokoll 15 BA_DE_JCP 300_v1 0 27 T tigkeit Activity durchgef hrt von performed by Datum Date Unterschrift Signature K ltemittelverfl ssiger reinigen Condenser cleaned Pumpenschl uche der Kondensat pump...

Page 28: ...AATWWXXX IBAN AT25 2011 1829 4301 5600 UNICREDIT BANK AUSTRIA AG BIC BKAUATWW IBAN AT89 1100 0039 9372 2200 UID Nr VAT No ATU20559900 Kreisgericht Wr Neustadt FN 119682 d Gesch ftsf hrer CEO G nter Zi...

Reviews: