P/N 960-000169R_Rev. A {EDP #217859}
© 2012, Japan CashMachine Co., Limited
1 6
VEGA-RC Twin™ Series Banknote Recycler Integration Guide
Operational Flowchart (Continued 3)
Figure 19 depicts part five of a typical VEGA-RC Twin™ “Retrieving” Banknote recycling flow process.
Figure 20 depicts part six of a typical VEGA-RC Twin™ “Clearing Error” Banknote recycling flow pro-
cess.
a) Start retrieving Banknotes
b) Has retrieving movement completed?
c) Banknote jam occurred?
D) From “Main” flow (See Figure 16)
F) To “Initializing” flow (See Figure 15)
d) Indication count down
e) Motor stop
f) Send error to host
E) To “Clearing Error” flow (See Figure 20)
Figure 19
VEGA-RC Twin Operational Flowchart (Retrieving)
a) Has error cleared?
E) From each flow when error occurred
F) To “Initializing” flow (See Figure 15)
Figure 20
VEGA-RC Twin Operational Flowchart (Clearing Error)