COMMISSIONING PROCEDURES
–
CABIN PRESSURISER
Commissioning Procedures
Follow each step of the installation guide that was supplied with the BreatheSafe kit.
Cabin sealing is an integral part of RS20 & ISO 23875; you must ensure that cabin seals are adequate for maintaining positive pressure.
In addition, the site (end- user) must have the correct procedure(s) for servicing OPERATOR enclosure seals in a proactive manner
rather than reactive. Items such as door and window seals must be in good working order or new seals FITTED before the BreatheSafe
system installation.
Touch-screen cabin pressure display/controller Part# 200027:
*System Check Function: enter the Settings menu option and select “System Check –
Set Max.” The minimum BreatheSafe
requirement for cabin sealing efficiency is 250 pascals; if this result is not met, it is essential to re-examine and find pressure leaks
of the enclosure and apply new sealing measures.
Submission for commissioning procedure as per the diagram below:
The commissioning images required are:
•
ID plate / Machine Serial Number / Asset Number or Call Sign
•
INPRESS TL Pressuriser location
•
HEPA Return Air Filter Location Option: Powered Return Air Filter
•
Cabin Pressure Display Location
–
Including the “System Check” maximum cabin pressure result with motor output capacity
%
Fill in the BreatheSafe Service Tag with the following details:
•
Machine Serial Number and Installers details
•
Date installed and System Check result (max cabin pressure)
•
The set cabin pressure with actual pressure and motor percentage output
•
Verify the 250-pascal threshold was achieved = pass OR not achieved = fail**
Please upload machine and installation details in conjunction with the required images. A Commissioning Certificate will be sent to the email
address you nominate. **Extended warranty for (RS20 & ISO 23875) BreatheSafe Systems is only applicable to operator enclosures meeting
this requirement.
Proceed to online commissioning:
“System Check”