© JBG-HT (v.2.0)
11
SERVICE MANUAL
– HEAT PUMP
3.6.4.
Vacation Periods
Setting vacation periods is implemented by selecting a date range. Within this range, the pump will operate in
the selected mode, regardless of the settings of the standard calendar.
3.6.5.
Week view
The weekly calendar is presented in the form of
colored bars that show the mode set.
Activities are according to the colors of the mode
icons on the right. Clicking on the bar of each day
takes you to the day settings.
3.6.6.
Special days
It is possible to set up to 6 special days on which the
heat pump will operate in the selected mode inde-
pendently of the standard operating calendar. We can
freely choose the mode of operation on a given day.
Clicking on the date will bring up the setting window.
3.6.7.
Date and time
3.6.8.
Manufacturer
This option is for the Heat Pump Manufacturer only.
3.6.9.
Service
This option is for the Heat Pump Service Technician only.
Summary of Contents for ZHHS-01-10K-R290-V5-M
Page 2: ......