page 5
www.jayline.co.nz
NOVEMBER 2016
6. Locate the heater in the required position (also see ‘Fitting Seismic Restraint’ after
installation instruction #10).
7. Using a plumb line fastened to the ceiling, mark the centre of the fl ue penetration position
and cut the ceiling hole to the required size and frame out.
8. Install the fl ue system (see fl ue installation instructions supplied with fl ue system).
Remember:
• The fl ue system should rise vertically from the appliance with as few offsets as possible.
Offsets should be limited as each change in direction creates a resistance to airfl ow and makes
fl ue cleaning diffi cult.
• The fl ue system must be well sealed with a minimum of 3 fi xings at each joint.
• The fl ue pipe penetrating the chimney must continue to the minimum length of 4.6m from the
top of the fl oor protector to the cowl.
• The Ø200mm liner must be fi tted from the ceiling plate and must extend all the way to the fl ue cowl.
2 x 1200mm lengths are supplied in the MKIII Flue Kit.
• Flue exiting more than 3 metres from the ridgeline must terminate no less than 1 metre above the
roof penetration (see diagram 1 below).
• Where the top of the fl ue pipe is more than 2 metres above its highest fi xing point, it must be
stayed against high winds.
9. Drill and fi x fl ue system into fl ue spigot with stainless steel self-tapping screws.
10. Drill and secure the appliance to the fl oor protector using the two holes in the rear bracket
of the appliance.
FITTING SEISMIC RESTRAINT
The Floor Protector must be mechanically fi xed to the fl oor by bolting or screwing.
Note: Floor Protector to be
fi xed by gluing when on a concrete fl oor that may have water pipes or electrical wires present. The appliance
can then be bolted to the fl oor protector with four 6mm x 50mm dynabolts or equivalent.