page 4
www.jayline.co.nz
JUNE 2018
• Flue exiting more than 3 metres from the ridgeline must terminate no less than 1 metre above the
roof penetration (see diagram 1 below).
• Where the top of the fl ue pipe is more than 2 metres above its highest fi xing point, it must be
stayed against high winds.
9. Drill and fi x fl ue system into fl ue spigot with stainless steel self-tapping screws.
10. Drill and secure the appliance to the fl oor protector using the two holes in the rear bracket
of the appliance.
FITTING SEISMIC RESTRAINT
The Floor Protector must be mechanically fi xed to the fl oor by bolting or screwing.
Note: Floor Protector to be
fi xed by gluing when on a concrete fl oor that may have water pipes or electrical wires present. The appliance
can then be bolted to the fl oor protector with two 6mm x 50mm dynabolts or equivalent.