
Page 22
Figure 11. Cell Installation and Flow/Temp/Salinity Sensor
* Ensure the DC Plug is properly and securely
connected to the terminal studs of the cell.
DC Cord Plug is Connected
to Terminal Studs*
O-Ring
Seal
Flow/Temp/Salinity Sensor
O-ring and Union Nut
2 x 2½” or 50mm Tailpiece
with Coupling Nut
2” x 2½” or
50mm Union
or
Sometimes
Not Covered
Temperature
Sensors
Flow/Temp/Salinity Sensor Face must
be clean at all times for proper operation
Salinity
Studs
5. Connect the DC cord to the control center. Feed the DC cord through the same strain relief fitting as the
flow/temp/salinity sensor. Plug the DC cord as shown in Figure 2a, 2b, and 2c.
CAUTION
Do not bury the electrolytic cell DC cord or Sensor cable directly in the ground. Direct burial can cause
damage to an electrical cord/cable.
6. Tighten strain relief fitting screws for the flow/temp/salinity sensor cable and the DC cord. Do not pull
flow/temp/salinity sensor cable or DC Cord too tight. Allow a little cable slack inside of control center
enclosure.
7. Check the wiring prior to reattaching front cover. Be sure the flow/temp/salinity sensor is plugged in.
The DC cord should be plugged in. Also, check the AC wiring.
CAUTION
Do not over tighten the strain relief fitting. Over tightening can cause damage to the flow/temp/salinity
sensor cable.
8. If disconnected, plug the ribbon cable into the J1 connectors the user interface and the Power Interface
PCB (See Figures 2a, 2b, 2c, and 10).
CAUTION
Do not operate the electrolytic cell without water circulation. A buildup of flammable gases can result in
FIRE or EXPLOSION.
Summary of Contents for AquaPure
Page 2: ...Page 2 ...
Page 51: ...Page 51 NOTES ...