![Jandy Air Energy AE-Ti Installation And Operation Manual Download Page 21](http://html1.mh-extra.com/html/jandy/air-energy-ae-ti/air-energy-ae-ti_installation-and-operation-manual_3333400021.webp)
Page 19
Figure 12. Electrical Wiring Diagram Symbol De
fi
nitions
24~
PUMP
PUMP TIME CLOCK
FAN
COMPRESSOR
WATER TEMPERATURE SENSOR
AIR TEMPERATURE SENSOR
FAN CAPACITOR
HIGH REFRIGERANT PRESSURE
LIMIT SWITCH
LOW REFRIGERANT PRESSURE
LIMIT SWITCH
POOL
SPA
GROUND CONNECTION
WATER PRESSURE SWITCH
OPTIONAL HEAT/COOL
REVERSING VALVE
24 VAC TRANSFORMER
COMPRESSOR CAPACITOR
SYMBOL DEFINITIONS
TERMINAL LUG (EARTH TERMINAL)
INTERNATIONAL LANGUAGES
HEAT EXCHANGER ANODE
i
208/230~
24~
24~
208/230~
24~
FACTORY INSTALLED 208/230 VAC
FIELD INSTALLED 208/230 VAC
380/420~
FIELD INSTALLED 380/420 VAC
FACTORY 24 VAC HARNESS
FACTORY 24 VAC
FACTORY OPTIONAL 24 VAC
380/420~
FACTORY INSTALLED 380/420 VAC