10
15. Connect the hoses from the valve bank on top of the frame to the down pressure relief valve bank on the
middle of the tongue. Connect (2) 3/8” x 84” hoses from the down pressure relief valve bank and drape the
hose past the front of the tongue. Attach the high flow poineer coupler (JM0018254) to the hose that goes to
the hydraulic motor but not to the PWM valve, then attach (5) low flow pioneer couplers (JM0039220) to the
rest of the hoses draped in front of the tongue. Please look to the beginning of this manual to reference where
hydraulic hoses should connect.
Frame
1. Holes are predrilled in the tank for the fittings. Add fittings in the two holes in the back of the tank, one 3/4”
NPT Bulkhead Tank Flange Assembly (JM0035222) and one 1-1/2” Poly Bulkhead Tank Fitting with EPDM
Gasket (JM0061522). Then one 3/4” NPT Bulkhead Tank Flange Assembly (JM0035222) for the hole in the front.
The rubber o-ring on the fitting goes inside the tank and the nut will screw on from the outside. These are
left-handed thread fittings. Then use a 1-1/2” Male Thread x 1-1/2” 90 deg Hose Barb (JM0061527) and (2) 3/4”
Hose Barb x 3/4” Male NPT; 90 Deg (JM0035226) respectively.
Tank