Commissioning 

 
Units with microchannel condenser coils 

 

Care must be taken during charging a unit with refrigerant when a 
microchannel condenser coil is fitted. Because the microchannel 
coils hold less refrigerant than traditional fin/tube coils, it is easier 
to overcharge, especially if the system is commissioned during 
winter time when the ambient temperature is colder. If too much 
refrigerant is added, this may cause tripping of the high pressure 
switch in warmer weather. Always check that the amount of 
condenser sub cooling is not excessive which may indicate 
refrigerant overcharge. 

 

System operation 

 

Once the system is correctly charged with refrigerant and the 
operating condition is stable, check that the compressor suction 
superheat is between 10K and 20K and that the compressor 
discharge temperature is between 50°C and 90°C. A suction 
superheat that is too low may indicate liquid refrigerant return to 
the compressor, whereas a suction superheat that is too high will 
not provide enough cooling effect for the compressor and will also 
cause high discharge temperatures. In either case, it is likely that 
compressor damage/failure will occur. 

 

For EVI Units Only: 

 

Controller EXD-HP1  

 

The controller EXD-HP1 used in the Series 4 EVI units operates as an 
economizer control. The setting of controller is preset by the factory 
and  is  password  protected.  Users  are  not  allowed  to  change  any 
settings in the controller. 
 
 

  

    

Safety Instructions:

 

 
 
 
 
 
 
 
 
 
 
 
 

Electrical Installation 

 

 

Do  not  operate  system  before  all  cable  connections  are 
completed. 

 

Refer to wiring diagram for electrical connections. 

 

Class  II  category  transformer  is  required  for  24VAC  power 
supply 

 

Do not connect any EXD-HP1 input to main voltage as it will 
permanently damage the controller. 

 

When  connecting  wires  of  expansion  valve  and  pressure 
sensor, consider color coding as follow: 

 
1.

 

EXM : BR: BROWN; BL: BLUE, OR: ORANGE; YE: YELLOW;  
            WH: WHITE 

 
2.

 

PT5 : BN: BROWN; WH: WHITE 

 
 
Display/ keypad unit (LEDs and button functions) 
 

 

 

 

In standard

 

mode the superheat is shown at the display. In 

case  of  liquid  injection  and  economizer  function  this 
changes to discharge temperature. 

 

To display other data of EXD-HP1 press “SEL” button for 1 
second until index number according to below table 
appears. Release “SEL” button and the next variable data 
will appears. By repeating the procedure variable data can 
be displayed in sequence as measured superheat (K)   
Measured suction pressure (bar)   valve position (%)   
Measured suction gas temperature (

°C)   Calculated 

saturated temperature (°C)   Measured discharge temperature 
(°C)   REPEATING

 

 

 
 

 
 
 
 
 
 

Digital input Di1/Di2 
 

 

The digital input Di1 is the interface between controller 
EXD-HP1 and system controller if Modbus communication 
has not been used. 

 

The digital status is dependent to operation of system’s 
compressor or demand. 

 
 

 
 

 
 
 
 
 
 
 
 
 

Variable data 

Controller EXD-HP1 

Default Superheat, K 

1        0 

Suction pressure, bar

 

1        1

 

Valve position, %

 

1        2

 

Suction gas temperature, °C

 

1        3

 

Saturation temperature, °C

 

1        4

 

Discharge temperature, °C

 

1        5

 

Operating Condition 

Digital input status 

Compressor starts 

Closed (Start) 

Compressor stops 

Open (Stop) 

1. Read installation instruction carefully. Failure to 

comply can result in device failure, system 
damage or personal injury. 

 

2.  Only person having appropriate knowledge and 

skill are allowed to manipulate the controller. 

 

3. Disconnect all voltages from system before 

installation. 

 

Summary of Contents for JEHR-0050-B1-M-1

Page 1: ...Issue 01 05 2019 Page 1 Contents COMMERCIAL CONDENSING UNITS INSTALLATION MANUAL V3 FUSION FUSION SCROLL Commercial Condensing Units Medium Low Temperature Applications ISSUE 01 05 2019 V3 ...

Page 2: ...ng 7 12 Wiring Diagrams 13 20 Service Maintenance 21 22 F Gas Information 23 Nomenclature JEH R 0140 B 2 M 1 J E Hall International Unit Series R Reciprocating S Scroll M Medium Temperature L Low Temperature Approximate HP 0140 1 4hp Power Supply 1 230V 1Ph 50Hz 3 400V 3Ph 50Hz Unit Generation EVI Vapour Injection Unit ...

Page 3: ...20 14 4 28 0 118 0 2 1 8 8 73 13 6 8500 3 4 1 3 8 226 43 JEHR 0115 B1 L 1 n c 1 10 n c n c n a n a 1 05 CAJ2446Z 4 55 0 48 2 8 8 2 30 0 1 0 2 0 44 2 4 1250 3 8 1 2 59 27 JEHR 0135 B1 L 1 n c 1 04 n c n c n a n a 0 98 CAJ2464Z 6 00 0 48 4 6 10 0 40 0 1 0 2 0 44 2 4 1250 3 8 1 2 61 27 JEHR 0175 B2 L 1 n c 1 00 n c n c n c n c 1 07 NTZ048 5VM B 8 40 0 95 0 50 4 5 11 0 37 0 1 0 6 0 51 4 5 2700 3 8 5 8...

Page 4: ...itted at all times Use of the units outside of the design conditions and the application for which the units were intended may be unsafe and be detrimental to the units regardless of short or long term operation The units are not designed to withstand loads or stresses from other equipment or personnel Such extraneous loads or stress may cause failure leak injury Installation Unit location In orde...

Page 5: ... device Careful attention should be paid to sizing of liquid lines on large risers maximum 6m In some circumstances a suction accumulator not supplied may be required It offers protection against refrigerant flood back during operation and also against off cycle migration by adding internal free volume to the low side of the system Tests must be conducted to ensure the amount of off cycle migratio...

Page 6: ...charge of oxygen free nitrogen Once the pipework installation is complete it should be pressure tested prior to evacuation to test for leaks A pressure leak test should be carried out using oxygen free nitrogen OFN NEVER USE OXYGEN FOR PRESSURE TESTING SYSTEMS A calibrated nitrogen pressure regulator must always be used Before starting any pressure testing ensure the area surrounding the system is...

Page 7: ...hecks Before starting the condensing unit the following checks should be carried out as a minimum Check electrical supply is correct and all connections are sound All moving parts are free and guards fitted Compressor oil level satisfactory Initial settings for safety switches and fan speed control Overload set correctly All valves in correct operating position Initial refrigerant charge Crankcase...

Page 8: ...sioning and during service maintenance visits For further information including recommended torque tightening values please refer to Service Maintenance section on pages 21 22 Vacuum operation Do not operate scroll compressors in a vacuum condition as this will cause the scrolls to overheat very quickly causing premature failure System charge Ensure an adequate liquid charge has been introduced to...

Page 9: ...its are mounted with discharge thermostat cut off 125 C cut in 90 C to protect the compressor For other unit models it is recommended to install the discharge thermostat if operating in extreme condition low evaporating and high ambient temperature Compressor Refrigerant S1 S2 Max HP Set Compressor MTZ NTZ MTZ Refrigerant R404A R407A R407F R448A R449A R452A R404A R452A R134a S2 Max HP Set 18 bar C...

Page 10: ...gram for electrical connections Class II category transformer is required for 24VAC power supply Do not connect any EXD HP1 input to main voltage as it will permanently damage the controller When connecting wires of expansion valve and pressure sensor consider color coding as follow 1 EXM BR BROWN BL BLUE OR ORANGE YE YELLOW WH WHITE 2 PT5 BN BROWN WH WHITE Display keypad unit LEDs and button func...

Page 11: ...mmissioning Manual mode operation Warning All alarms are disabled during manual control We do not recommend unattended operation of system during manual control Manual alarm reset clearing functional alarms except hardware error ...

Page 12: ...g EXD HP1 Error Alarm handling Note When multiple alarms occur the highest priority alarm is displayed until being cleared Then the next highest alarm is displayed until all alarms are cleared Only then will parameters will be shown again ...

Page 13: ...Issue 01 05 2019 Page 13 Wiring Diagrams JEHR 0050 B1 M 1 JEHR 0067 B1 M 1 JEHR 0100 B1 M 1 JEHR 0113 B1 M 1 ...

Page 14: ...Issue 01 05 2019 Page 14 Wiring Diagrams JEHR 0115 B1 L 1 JEHR 0135 B1 L 1 JEHR 0140 B2 M 1 ...

Page 15: ...Issue 01 05 2019 Page 15 Wiring Diagrams JEHR 0140 B2 M 3 JEHR 0150 B2 M 1 JEHR 0175 B2 L 1 JEHR 0225 B2 L 1 ...

Page 16: ...Issue 01 05 2019 Page 16 Wiring Diagrams JEHR 0150 B2 M 3 JEHR 0175 B2 L 3 JEHR 0225 B2 L 3 JEHS 0200 B2 M 1 JEHS 0250 B2 M 1 JEHS 0300 B2 M 1 ...

Page 17: ...Issue 01 05 2019 Page 17 Wiring Diagrams JEHS 0200 B2 M 3 JEHS 0250 B2 M 3 JEHS 0300 B2 M 3 JEHS 0200 B2 L 3 JEHS 0300 B2 L 3 JEHS 0350 B3 M 1 JEHS 0400 B3 M 1 ...

Page 18: ...e 01 05 2019 Page 18 Wiring Diagrams JEHS 0350 B3 M 3 JEHS 0400 B3 M 3 JEHS 0500 B3 M 4 JEHS 0600 B3 M 3 JEHS 0680 B3 M 4 JEHS 0400 B3 L 3 JEHS 0500 B3 L 3 JEHS 0600 B3 L 3 JEHS 0800 B4 M 3 JEHS 1000 B4 M 3 ...

Page 19: ...Issue 01 05 2019 Page 19 Wiring Diagrams JEHS 0750 B4 L 3 JEHS 0950 B4 L 3 EVI ...

Page 20: ...Issue 01 05 2019 Page 20 Wiring Diagrams JEHS 1150 B4 L 3 EVI ...

Page 21: ...he coil We recommend putting your thumb over the end of the hose rather than using a nozzle end because the resulting spray is gentler and the possibility for impact damage is less Micro channel heat exchangers because of their fin geometry tend to retain water more than traditional fin tube coils Depending on the specific design and installation of your coil it may be beneficial to blow or vacuum...

Page 22: ... ZB15KQE TFD 558 JEHS 0250 B2 M 1 ZB19KQE PFJ 558 JEHS 0250 B2 M 3 ZB19KQE TFD 558 JEHS 0300 B2 M 1 ZB21KQE PFJ 558 JEHS 0300 B2 M 3 ZB21KQE TFD 558 JEHS 0350 B3 M 1 ZB26KQE PFJ 558 JEHS 0350 B3 M 3 ZB26KQE TFD 558 JEHS 0400 B3 M 1 ZB29KQE PFJ 558 JEHS 0400 B3 M 3 ZB29KQE TFD 558 JEHS 0500 B3 M 3 ZB38KQE TFD 558 JEHS 0600 B3 M 3 ZB45KQE TFD 558 JEHS 0680 B3 M 3 ZB48KQE TFD 558 JEHS 0800 B4 M 3 ZB5...

Page 23: ...y 12 months but can be increased to 24 months if fitted with a fixed leak detection system 30 300 kgs 50 500 TCO Eq Every 6 months but can be increased to 12 months if fitted with a fixed leak detection system 300 kgs 500 TCO Eq Every 6 months however automatic leak detection system is mandatory which requires servicing every 12 months To calculate TCO Eq value Refrigerant charge kgs x Refrigerant...

Page 24: ...J E Hall Limited Hansard Gate West Meadows Derby DE21 6JN England Tel 44 0 1332 253400 Fax 44 0 1332 371061 Email helpline jehall co uk www jehall com Issue 01 05 2019 ...

Reviews: