45
EN
CLIMA CANAL H8 / H10 | MANUAL | 9 MAART 2020, 15:00
Mount the valve cover plate. Cover the casing with the protective
cover.
This protective screen must remain on the unit during the
entire construction phase.
Fine adjustment to max. 0.8 cm, for a perfect alignment with the
finished floor.
If screed is used the device needs to be completely insulated in
order to protect the device from voltage differences.
Install the grille. Apply the finishing touches .
18
20
19
21