background image

2-1/2" D.

1

SPOUT ASSEMBLY

2

TEE AND HOSE ASSEMBLY

Install O-RING (2) into SPOUT ESCUTCHEON BASE (3). Insert SPOUT
SHANK (1) through center hole of tub or mounting surface.

Assemble RUBBER WASHER (4), FIBER WASHER (5) and LOCKNUT (6)
onto threads of SPOUT SHANK (1) from underside of lavatory or mounting
surface.

Push one RING WASHER (1) and one 0-RING (2) onto end
of SPOUT SHANK (3).

Slide the TEE (4) onto SPOUT SHANK (3) until it makes
contact with the 0-RING (2). Push the other 0-RING (2)
and RING WASHER (1) onto the SPOUT SHANK (3).
Make sure both 0-RINGS (2) are seated into grooves
of TEE (4).

Thread LOCK NUT (5) onto SHANK (3). Rotate TEE (4)
about 10 degrees from center and tighten securely.

Insert FIBER WASHERS (6) into COUPLING NUTS (7) of
SUPPLY HOSES (8) and tighten.

Align SPOUT and tighten LOCKNUT (6).

Note: All deck mounted Roman tub sets must be installed with the
tub spout outlet at least two (2) inches above the flood level rim of
the tub. See Figure 1a.

1

2

4

5

6

3

Turn off hot and cold water
supplies before beginning.

CAUTION

1-3/4" MAX.

1-5/16" D.

8

2

2

1

1

3

4

GROOVE IN TEE

GROOVE IN TEE

10˚

FRONT

2" MAX.

1-1/8" D.
(TYP.)

Figure 1a

DECK MOUNT

BATH

RIM

BATH

RIM

TWO (2) INCHES

MINIMUM

TUB MOUNT

TWO (2) INCHES

MINIMUM

ROUGHING-IN
DIMENSIONS

H 9 6 5 1 3 6 A

H 9 6 5 1 3 6 A

Plumbers' Putty or Caulking

Adjustable Wrench

Phillips Screwdriver

Channel Locks

TOOLS REQUIRED

Tubing Cutter

Regular Screwdriver

Basin Wrench

LEVER
HANDLE

CROSS
HANDLE

6-3/4" TO 9-1/2" MAX.

MOUNTING
SURFACE

2-3/8" D.

8-1/4"

6-1/4"

10"

15º

3

INSTALL VALVE BODIES AND HANDLES

INSTALL HANDLES (LEVER and CROSS)

Thread LOCKNUT (8) to bottom of VALVE BODY (2). Make sure
FIBER WASHER (9) and RUBBER WASHER (10) are installed.
Insert VALVE BODY (2) through mounting hole from underside
of tub deck or mounting surface. 

Note: VALVE BODY marked Hot is installed in the left Mtg. hole,
VALVE BODY marked Cold in the right when facing front of fitting.
Maximum mounting surface thickness is 1-3/4".

HANDLE ASSEMBLIES(1, 1A) are installed on VALVE BODIES (2) and must
be removed to install VALVE BODIES (2) from under tub deck or mounting
surface.

To remove HANDLE ASSEMBLY(1), unthread HANDLE BASE (3) with
LEVER (4) from VALVE BODY (2). Pull HANDLE ASSEMBLY(1) off
VALVE STEM (5).  

Unthread and remove MOUNTING RING (6) and SPACER (7).

From top install SPACER (7) onto VALVE BODY (2). Thread
MOUNTING RING (6) on VALVE BODY (2) until seated tightly against
SPACER (7). Set VALVE BODIES (2) so that their outlets are facing
toward SPOUT TEE (11) and then tighten LOCKNUT (8) using 35mm
or adjustable wrench.

Insert FIBER WASHERS (12) into COUPLING NUTS (13) of
SUPPLY HOSES (14) and tighten making water tight connection.

Important: Loop SUPPLY HOSES (14) as illustrated so they do not kink. 

6

1

3

4

15

7

"O" RING

1A

1-3/4'' MAX.

8

12

HOT

9

10

5

2

JADO

TUB DECK OR
MOUNTING SURFACE

HOT

13

14

11

Turn VALVE BODIES (2) to off position. Install ESCUTCHEON (15) onto VALVE BODY (1). Align HANDLES as shown or as
desired and install HANDLE ASSEMBLY (1, 1A) onto VALVE STEM (5). Thread HANDLE BASE (3) onto VALVE BODY (2)
until seated tightly against ESCUTCHEON (15). 

COLD

3/4"NPT
INLETS

NOTE: MOUNTING HOLES
ARE 1-3/8" D.

Reviews: