4-69
4
O
PE
R
A
TI
O
N
AN
D
A
D
JU
ST
M
ENT
S
ARBUS 1000
b. Cutting the shaft
• Dismantle the protection guards as
shown in the figures A and B.
• Cut the two tubes (male and female)
at the desired dimensions (figure C).
• Remove the burrs resulting from the cut-
ting operation as well as the filings re-
sulting from the burrs removal (figure D).
• Cut the guard tubes length using as
measure reference the pieces of the
tubes cutted (figure E).
• Clean the residues of cutting.
PTO Shaft adjusting
A
B
C
D
E
F
H
I
G
c. Assembling:
• Assemble the PTO shaft as shown in
the figures F,G,H,I and lubricate it if
necessary.