15
07610-002-23-32-AC
Reinstall the four 1/4-20 bolts that were removed in step 1 with a 7/16 wrench. They insert into the machine on the
right and left corners.
Ventless/Energy Recovery Unit
3
Connect pressure gauge with a 9/16 wrench. Connect the two hoses using an adustable wrench. The hoses are cut-
to-length and will only reach their intended connection point.
A. Connect the Gauge
B. Final Rinse Inlet
C. PRV Inlet from Coil
D. Booster Outlet
Before moving to the next step, tidy up the hoses by sliding them under the clamps. You might need to loosen the nut
to accomplish this.
4
5
VENTLESS MOUNTING INSTRUCTIONS
INSTALLATION
Summary of Contents for TempStar HH
Page 39: ...31 07610 002 23 32 AC 30 28 29 25 22 21 26 33 34 36 1 TOP MOUNT CONTROL BOX PARTS ...
Page 46: ...07610 002 23 32 AC 38 1 5 4 2 3 6 7 10 8 9 HOOD ASSEMBLY PARTS ...
Page 58: ...07610 002 23 32 AC 50 INLET PLUMBING PARTS 1 2 3 4 5 6 2 7 8 9 10 11 12 13 14 10 11 15 13 14 ...
Page 60: ...07610 002 23 32 AC 52 OUTLET PLUMBING PARTS 1 2 3 4 5 2 2 ...
Page 62: ...07610 002 23 32 AC 54 INLET PLUMBING HH E PARTS 1 13 9 2 3 4 5 6 7 5 8 10 11 12 2 14 ...
Page 64: ...07610 002 23 32 AC 56 OUTLET PLUMBING HH E PARTS 1 2 3 4 5 7 6 ...
Page 78: ...07610 002 23 32 AC 70 460 V MACHINE TRANSFORMER MOUNTING BOX PARTS ...
Page 79: ...71 07610 002 23 32 AC EXHAUST FAN CONTROL OPTION PARTS ...
Page 84: ...07610 002 23 32 AC 76 SCHEMATICS 208 230 V 50 60 HZ 1 PHASE ...
Page 85: ...77 07610 002 23 32 AC SCHEMATICS 460 V 50 60 HZ 3 PHASE ...
Page 86: ...07610 002 23 32 AC 78 SCHEMATICS LT NB 208 230 V 50 60 HZ 1 PHASE ...
Page 87: ...79 07610 002 23 32 AC SCHEMATICS LT NB 460 V 50 60 HZ 3 PHASE ...
Page 88: ...07610 002 23 32 AC 80 SCHEMATICS STEAM 208 230 V 50 60 HZ 1 3 PHASE ...
Page 89: ...81 07610 002 23 32 AC SCHEMATICS SDI OPTIONS ...
Page 90: ...07610 002 23 32 AC 82 SCHEMATICS DRAIN QUENCH OPTION ...