CONFIDENTIAL
PROJECT NAME
| date
项目名称
|
日期
26
Operation Instruction
–technical parameter
Electro
nic
thread
slack
210 0
0/1/2/3
/4/5/6
thread slack electromagnet timing selection:
0:[LS] After set angle then make thread slack movement , until upper
needle position delay again [T2] to the setting time
1:[LS] After set angle then make thread slack movement ,until [LE] set
angle.
2:[LS] After set angle then make thread slack movement , delay [T2] to
setting time 。
3:After down needle position signal delay [T1] setting time to slack
thread , until delay to [T2] setting time.
4:After upper needle position signal delay [T1] setting time to slack
thread , until delay to [T2] setting time
5:After down needle position signal start to thread slack until up needle
position stop, then delay [T1] setting time then make [T2] setting thread
slack time
6:[LS] After set angle then make thread slack movement , until upper need
stop. Then delay [T1] setting time then make [T2] setting thread slack time
P+ power
button
211 35
5-359 thread slack electromagnet starting angle LS(relative to down needle angle)
212 300 10-359
thread slack electromagnet ending angle LE(relative to down needle angle,
bigger than LS)
213 1
1-999 thread slack electromagnet starting delay time T1(ms)
214 10 1~999 thread slack electromagnet upper needle position delay time T2(ms)
265 5
0~30 0:forbid to output 5: thread slack electromagnet