![J.P. Instruments EDM-900 Installation Manual Download Page 12](http://html1.mh-extra.com/html/j-p-instruments/edm-900/edm-900_installation-manual_3102691012.webp)
FAA Approved Installation Manual for the
Report No 908
EDM-900 and EDM-930
Page 12 of 56 Rev I
Primary Engine Data Management System
Date 1-18-2013
9.
Probe Wiring
When cutting the pair of leads to the proper length to connect to the probes, leave enough slack in the wiring so
that probe may be interchanged to an adjacent cylinder if necessary for trouble-shooting and servicing.
Thermocouple wire length is not critical and should be trimmed to any length as required for a clean installation.
The Temperature probe must be wired with the correct polarity. The temperature probe connects to its temperature
indicator with yellow jacket Teflon Chromel Alumel wire supplied. Strip the wires as shown below—observing color-
coding.
1/4"
1 1/2"
Fold back wire
double before
crimping terminals
2 1/4"
Thermocouple wire harness
red
yellow
Terminate each wire with a crimp-on ring terminal, provided. The ring terminals may be crimped with an AMP part
number 48518 crimp tool is recommended however, a “service-type” tool may also be used. Verify the quality of
each crimp with a sharp tug on the wire. The terminal should be impossible to pull off when crimped correctly.
shrink tubing
ring terminal
Place a ¼ x 4-inch sleeve over each pair of wires in the wiring. Connect the wire ring lug to the probe ring lug using
the supplied number 4 screws and nuts, placing the star washer
between
the ring lugs, not against the nut.
Important: place star waster between two ring
terminals and tighten nut and bolt as
necessary
to instrument
to probe
Slide the sleeve over the joint and secure with three tie-wraps.
1/4 x 4" sleeve
tie-wrap 3 places
The most common installation problems are related to poor quality terminations.
10.
Wiring Markings
The EDM-900/930 is supplied with special Teflon insulated Chromel Alumel factory assembled wiring harness
configured for the correct number of cylinders. The wire harness is marked E1= EGT-1, C1= CHT-1, etc.
NOTE:
Unlike most other EGT & CHT installations
the probe wire length is not critical
and should be
trimmed to any length as required for a clean installation.
Do not extend the thermocouple wire with
copper wire.
11.
Exhaust Gas Temperature Probe (EGT) Installation
Use the J2 connector harness 700700 or 700702 labeled E1 through E4 or E6. Remove the existing EGT gauge
and Probe. Replace with JPI probe M-111 in all exhaust stacks.