
l
Remove all external plastic protective film prior to chassis operation.
l
Operator intervention may be required to power cycle the XGS12 chassis or restart a software
program in the event the XGS12 chassis operation is upset or stopped by electrostatic discharge.
Chapter 3 Install XGS12 Chassis
– 6 –