- 21 -
Installation
■ Electrical wiring
Electrical wiring must be done by a qualified person who has a full knowledge of safety. We are not respon-
sible for personal injury or property damage due to nonobservance of this warning. Contact us or your near-
est distributor as necessary.
<Before wiring>
1. Confirm that power is disconnected before work.
2. Wiring work should be done in accordance with relevant electric work requirements. Use the recommend-
ed wiring accessories.
3. Observe the rated voltage specified on the name plate.
4. When an earth leakage breaker is used and has tripped, always investigate and solve root causes before
resuming operation. Be sure to unplug the pump during investigation.
5. Connect an earth wire to the earth terminal on the motor with a M4 screw.
Capacitor
Auxiliary coil
Primary coil
Rotor
Power source
Summary of Contents for APN-450
Page 17: ... 15 Installation 1 Before installation 16 2 Installation Tubing Electrical wiring 19 ...
Page 24: ... 22 Operation 1 Before operation 23 2 Pump operation 23 ...
Page 26: ... 24 Maintenance 1 Troubleshooting 25 2 Maintenance Inspection 26 3 Wear part replacement 27 ...
Page 34: ... 32 ...
Page 35: ... 33 ...