20
5.1 Heating connection
It is essential to take care of professional bleeding (e.g. automatic bleeder) when
connecting the
LATENTO
500 to the heat generator/s.
5.2 Transportation
Note
The
LATENTO
500 must always be delivered in a standing
position so as to avoid any damage.
The
LATENTO
500 may be tilted max. horizontally for a short time, e.g. when car-
rying it to the place of installation. Great care must be taken that the cover was
closed with all four clamps.
5.3 Mounting
Heed the following points when selecting the installation site for the
LATENTO
500:
Frost-protected room.
Level, clean swept floor.
do not subject the
LATENTO
500 to direct solar radiation
(the UV can destroy the plastic).
Heed the load capacity of the foundation, the filled
LATENTO
500 weighs
approx. 580 Kg.
Keeping heat losses as little as can be, place the
LATENTO
500 in the vicinity of
the reheating heat generator
If possible, mount system in a heated room to minimize heat losses
(EnEV – Energy Saving Decree)
Summary of Contents for LATENTO 500
Page 14: ...12 Produktdatenblatt...
Page 15: ...E Illustration similar LATENTO 500 Unpressurized buffer storage tank Mounting instruction...
Page 29: ...F Fig similaire LATENTO 500 Accumulateur tampon Notice de montage...
Page 43: ...ES Fig similar LATENTO 500 Acumulador de reserva Instrucciones de montaje...