Operation Manual - Hobart 2400 Compact – 120 / 140 / 180 kVA
Operator’s Instructions
Document no. 578.430AB
Page 46 of 75
14:54:33
Black Box 26/08/2016
Date Time Error
001: 06/28/2013 14:54:33 4307
002: 06/28/2013 10:33:44 4207
003: 06/28/2013 10:25:10 0301
004: 06/28/2013 10:24:17 0301
005: 06/28/2013 10:11:24 0301
◄ Back
●
View Error
14:54:33
06/28/2013 I - 4307
OVERLOAD:
200% < I < 300% - 10 s
OUTPUT ( I )
●
Alarm Data 001/100
Highlight the by using the navigation
◄▼▲► keys.
Press
●
to select ”View Error” sub-menu.
Use the ▼/▲ to highlight the failure you want to view.
Press
●
to select View information on the error.
The error is then explained in clear text.
Press
●
to view detailed Alarm Data.
Use the ▼/▲ to browse through the recorded data.
Use
◄
to leave the sub-menu.
Use
◄
to leave the sub-menu and return to basic Icon
Menu.
Note!
The Black Box contains 100 recordings. When the limit
is reached, the oldest failure is deleted.
OUTPUT ( I )
VOLT AMP
Phase A:
94.2 V 525 A
Phase B:
93.2 V 527 A
Phase C:
93.2 V 526 A
Average:
93.3 V 526 A
◄ Back ▼/▲ Next/Prev
6.3.3 Black Box – Menu structure
OUTPUT ( II ) VOLT AMP
Phase A:
0.0 V 0 A
Phase B:
0.0 V 0 A
Phase C:
0.0 V 0 A
Average:
0.0 V 0 A
◄ Back ▼/▲ Next/Prev
INVERTER ( I ) ( II )
Phase A:
< 20 A 212 A
Phase B:
< 20 A 212 A
Phase C:
< 20 A
213 A
DC-Voltage:
592 V 592 V
DC-Ripple:
2 V 6 V
INTERLOCK
LEVEL RIPPLE
Output ( I ):
24 V 1 V
Output ( II ):
0 V 0 V
Inv. ( I ) Temp: 65° C 65° C
Inv. ( II ) Temp: < 40° C < 40° C
SYSTEM
Control Voltage:
25.2 V
NVS Level:
2 V
ELS Level:
3 A
Hour Meter:
04:49:36
Consumption:
438 kWh
Input / Output Port Status
1 2 3 4 5 6 7 8
I 9 10 11 12 13 14 15 16
N
17 18 19 20 21 22 23 24
O 1 2 3 4 5 6 7 8
U
T 9 10 11 12 13 14 15 16
OM2252
Rev 0 December 15 2016