Operation Manual - Hobart 2400 Compact – 120 / 140 / 180 kVA
Operator’s Instructions
Document no. 578.430AB
Page 43 of 75
11:27:47
Setup Menu 26/08/2016
GPU Enable
Door Switch
Cable Temperature
Neutral Voltage Supervision
Earth Leakage Level
Earth Leakage Delay
◄ Back
●
Select Parameter.
Setup (continued) – Menu structure
Use the ▼/▲ to browse through the
various set-up lines / parameters. The
selectable line will be highlighed in
green.
Press
●
to select the parameter you
want to change.
Press
●
to Modify parameter.
Parameter will now be highlighted in
green.
Use the ▼/▲ to adjust parameter.
Press
●
to save changes.
Use
◄
to leave the sub-menu and
return to basic Icon Menu.
Note!
Availability of parameters may vary
depending on the mode of the unit
Standby / operating / load profile etc.
Settings:
Bypassed
Active
11:27:47
Setup Menu 26/08/2016
Door Switch
Active
◄ Back
●
Modify
Settings
Bypassed
Active
11:27:47
Setup Menu 26/08/2016
Cable Temperature
Normally Closed
◄ Back
●
Modify
Settings:
0.0 = Disabled
0.1 – 50.0 V
11:27:47
Setup Menu 26/08/2016
Neutral Voltage Supervision
42.0 V
◄ Back
●
Modify
11:27:47
Setup Menu 26/08/2016
GPU Enable
Active
◄ Back
●
Modify
11:27:47
Setup Menu 26/08/2016
Earth Leakage Delay
1000 ms
◄ Back
●
Modify
11:27:47
Setup Menu 26/08/2016
Earth Leakage Level
15 A
◄ Back
●
Modify
Settings:
0 – 1000 ms
Settings:
Normally Closed
Normally Open
Settings:
0.0 = Disabled
0.1 – 15,0 A
OM2252
Rev 0 December 15 2016