1
2
3
4
5
6
Item Description
1.
Baseplate
2.
Foundation
3.
Sleeve
4.
Dam
5.
Bolt
6.
Grout
Figure 17: Pour grout into baseplate
6.
Fill the remainder of the baseplate with grout, and allow the grout to set for at least 48 hours.
1
2
3
4
5
6
Item Description
1.
Baseplate
2.
Foundation
3.
Sleeve
4.
Dam
5.
Bolt
6.
Grout
Figure 18: Fill remainder of baseplate with grout
7.
Remove the leveling jackscrews after the grout hardens in order to remove any stress points.
4.5 Grout the baseplate
30
3640 i-FRAME API Type BB2 2-Stage / ISO 13709 2nd Ed. API 11th Ed. Installation, Operation, and Maintenance Man-
ual
Summary of Contents for Goulds Pumps i-FRAME 3640
Page 2: ......