
37
Operation
6 START-UP AND REGULATION
FIXING: Check that the pump is properly secured
HYDRAULIC CIRCUIT CHECK: Check that all valves are open, and that the bleed and relief valve
outlets are diverting the liquid to a container
PUMP CHECK: Make a visual/auditory check of the correct operation of the pump.
PRIMING: To facilitate pump priming, open the priming valve.
OVERPRESSURE PROTECTION: Adjust the safety, overpressure or pressure relief valve to the
desired pressure to protect the installation, while never exceeding the nominal pressure of the pump.
Create Flow
[email protected]
www.createflow.cz
Distribuce Create Flow
tel: +420 722 712 652