42
TXG23
Rear Linkage (4WD model)
FIG. 45: Linkage consists of several major components
for implement attachment and operation:
Lower Links, 1 - Primary attaching points to lower imple-
ment pins.
Lift Rods, 2 - Connect lower links to hydraulic lift arms for
raising/lowering of lower links. The lift rod connected to
the right lower link has provisions for leveling the imple-
ment (side to side).
Stabilizers, 3 - Reduce side sway of implement.
Top Link, 4 - Adjustable, turnbuckle type to level imple-
ment (front to rear).
FIG. 45