iii
GLS
Sampler
Table of Contents
1.1 Introduction . . . . . . . . . . . . . . . . . . . . 1-1
1.2 Sampler Preparation Checklist . . . . . 1-2
1.3 Inspecting the Pump Tube . . . . . . . . 1-3
1.4 Discharge Tube . . . . . . . . . . . . . . . . . 1-4
1.5 Installing a Bottle . . . . . . . . . . . . . . . 1-5
1.6 Sample Cooling . . . . . . . . . . . . . . . . . 1-5
1.7 Installing a Power Source . . . . . . . . . 1-6
1.7.1 To install an Isco Model 900
power source: . . . . . . . . . . . . . 1-6
1.8 Suction Line and Strainer . . . . . . . . . 1-7
1.8.1 Cutting the Suction Line . . . . 1-8
1.8.2 Attaching the Strainer . . . . . . 1-8
1.8.3 Connecting the Suction Line . 1-9
1.9 Connecting External Devices . . . . . 1-10
1.10 Positioning the GLS . . . . . . . . . . . . . 1-11
1.10.1 Positioning the Strainer and
Suction Line . . . . . . . . . . . . . 1-12
1.11 Locking the GLS . . . . . . . . . . . . . . . 1-14
2.1 The Keypad . . . . . . . . . . . . . . . . . . . . 2-1
2.2 Programming the GLS . . . . . . . . . . . 2-2
2.3 One-button Programming . . . . . . . . . 2-3
2.3.1 Stored Program . . . . . . . . . . . . 2-3
2.4 Standard Programming . . . . . . . . . . . 2-4
2.4.1 Sample Pacing . . . . . . . . . . . . 2-5
2.4.2 Pacing Interval . . . . . . . . . . . . 2-6
Summary of Contents for GLS
Page 2: ......