M10 bolt
M12 bolt (other location)
1
2
3
6
GB
5 Getting Smart Load ready for use
GETTING SMART LOAD READY FOR USE
6 Maintenance
MAINTENANCE
Daily:
- Clean the storage compartment.
- Spray moving parts with silicon spray.
- Check if the tacker is properly attached.
- Verify that the air pressure is 7 bar.
- Check for any leakage
Summary of Contents for Senco Smart Load SHS51XP
Page 2: ...2 GB NL English 3 Nederlands 15 F Fran ais 27...
Page 12: ...12 GB 10 6 Smart Load steel housing and staple transport...
Page 14: ...14...
Page 24: ...24 NL 10 6 Smart Load steel housing and staple transport...
Page 26: ......
Page 36: ...F 36 10 6 Bo tier acier transport agrafes Smart Load...
Page 38: ...38 GB NL F...