PCW Control
S
Installation
15
Advisor-Based Schedule
The watering schedule created by the Advisor is described on the Advisor panel and depicted in the
Schedule Viewer (Figure 2.25).
Note:
The “Advisor” icon will be displayed in the lower corner of a Zone Button when the Scheduling
Advisor is controlling the zone watering schedule. The
Use Advisor
option must be unchecked to remove
or modify the Advisor-based zone schedule.
Figure 2.25